My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1738 - SP1743
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1738 - SP1743
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:28:26 AM
Creation date
1/23/2016 12:26:37 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Thornton Road Resurfacing
Limits
Walnut Grove Road to Sacramento County
Year
1998
Project Engineer
Jose Zapada
Roads Worked
Thornton Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP1738 - SP1743
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR DRIVEWAYS TYPE iid <br /> PAVEMENT REINFORCING <br /> Location Quantity <br /> ® New Hope Intersection 61 S.Y. Quantity FABRIC(3 Locat ons) 12 Location Quantity <br /> Sta. 0+70 to Sta. 110+06 26733 S.Y. <br /> PLANING ASPHALT CONCRETEDRIVEWAYS TYPE "E " Sta. 110+06 to Sta. 116+94 2,294 S.Y. <br /> PAVEMENT <br /> (30' wide) <br /> Location Quantity Quantity Areo Sta. 116+94 to Sto. 118+06 349 S.Y. <br /> Mainline 26 1 ,102 S.Y. (28' wide) <br /> Sta. 0+40 to Sta. 0+70 147 S.Y. <br /> Sta. 118+00 to Sta. 118+06.5 22 S.Y. <br /> Intersections 237 S.Y. <br /> ASPHALT CONCRETE Total 29,376 S.Y. <br /> (5 Locations) (TYPE A) <br /> Total 406 S.Y. Location uan I METAL BEAM GUARD RAILING <br /> Mainline (Resurfacing 5,422 Tons <br /> ADJUST MONUMENT Sta. 0+40 to Sta. 118+06.5 Location Quantity <br /> Sto. 111 +38t to Sta.118+04t(Lt.) 681 .25 L.F. <br /> FRAMES AND COVERS ASPHALT CONCRETE <br /> Sta. 115+73 to Sta. 200 L.F. <br /> Location Quantity TYPE B Sta. 117+85 to Sta.118+04t(Rt.) 18.75 L.F. <br /> Sta. 47+73 1 EACH Location Quantity Total 900 L.F <br /> Intersections (7 Locations) 214 Tons <br /> Pavement Repair 27 Tons <br /> 6 ADJUST WATER VALVE Driveways, Types "D" & "E" 216 Tons <br /> D FRAMES AND COVERS Dikes Type A" & "6" 20 Tons TERMINAL SYSTEM (TYPE SRT) <br /> i nShoulder Reconstruction 72 Tons <br /> R Location Quantity (Sto. 110+06 to Sta 118+06) Location Quantity <br /> § ® Pine Street, Intersection 2 EACH Total 549 Tons Sta. 111 +01 (Lt.) 1 EACH <br /> 0 <br /> ® New Hope Road, Intersection 4 EACH Sta. 115+35 (Rt.) 1 EACH <br /> Total 6 EACH PLACE ASPHALT CONCRETE DIKE Total 2 EACH <br /> TYPE "A" <br /> EARTHWORK Location Quantity <br /> (MISCELLANEOUS AREAS) Sto. 110+06 to Sta. 115+10 Rt. 507 L.F.A Location Quantity Sta. 115+72 to Sta. 117+60 (Rt. 188 L.F. TERMINAL SECTION (TYPE A) <br /> Total 695 L.F. Location Quantity <br /> M Sta. 110+06 to Sta.118+06.5 8 Sta. <br /> PLACE ASPHALT CONCRETEDIKE Sta. 118+04t (Lt.) @ Bridge 1 EACH <br /> TYPE "C" Sta. 118+04t (Rt.) ® Bridge 1 EACH <br /> SHOULDER BACKING Sta. 117+70t (Rt.) 1 EACH <br /> ;0 Location Quantity Location Quantity Sta. 117+85t (Rt.) 1 EACH <br /> < Sta. 115+10 to Sta. 115+72 Rt. 62 L.F. Total 4 EACH <br /> LA Sta. 0+40 to Sta.118+06.5 1 ,318 Tons Sta. 117+60 to Sta. 118+06 Rt. 47 L.F. <br /> Z Total 109 L.F. <br /> D COUNTY OF SAN JOAQUIN No sc� S�INIMARY CIF QUANTITIES THORNTON ROAD RESURFACING 6 eof "6 <br /> (Walnut Grove Road to Sacramento County) <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVA ECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.