My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1904 - SP1911
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP1904 - SP1911
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 12:05:08 PM
Creation date
1/23/2016 12:30:51 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Munford Avenue and Mariposa Heights Resurfacing
Year
1999
Roads Worked
Munford Ave., Silva St., Montezuma St., Section Ave.
Hall Ave., Learned Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP1904 - SP1911
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wide <br /> GENERAL NOTES <br /> '. See Note below <br /> I. The Contractor shall obtain a Caltrans Encroachment Existing <br /> Permit for any construction area traffic control devices Surface <br /> placed on Moriposo Rood. <br /> Pi <br /> 2. All trees, shrubs and fences shall remain in place ;! �"aiH a ", <br /> j unless otherwise shown on the plans. <br /> 3. Shoulder Backing Material at all intersection rodii shall O.-SO' Aepholt <br /> be blended with native material as directed by the Engineer. Concrete <br /> Payment for blending of material will be by Item No.1, Note: <br /> Force Account. Width (4' min.), length and locations <br /> 4. Al earthwork (including Shoulder Backing, except for to be determined by the Engineer. <br /> final grading of the shoulders) shall be completed prior <br /> to placing final layer of asphalt concrete. <br /> 5. Crack sealing of existing surface shall be as directed PAVEMENT REPAIR DETAIL <br /> by the Engineer. Payment for the work will be by _ <br /> Item No.t, Force Account. <br /> i f <br /> 0 6. Placement of Asphalt Concrete surfacing shall not begin <br /> until asphalt concrete used in Pavement Repair has _ <br /> been in place a minimum of 36 hours. <br /> ? b <br /> 7. Asphalt Concrete shall to placed as noted below: <br /> 9 =' 0.40' A.C. Thickness — Three (3) layers of approximately Conform • E.P. <br /> i3 ? equal thickness with pavement reinforcing fabric between CorAorm E.P. <br /> a the second and top layer. EP EP <br /> • <br /> 8 m 0.25' A.C. Thickness — Two (2) layers of approximately <br /> o equal thickness with pavement reinforcing fabric between <br /> the bottom and second layer. 1:1 1:1 � $ R R <br /> „ 0.17' A.C. Thickness — One (1) layer, no pavement 1 <br /> is reinforcing fabric. <br /> Conform —Conform <br /> 8. Frames and Covers of Water Boxes and Gas Valve <br /> Boxes shall be adjusted to finished grade by others ExistingWidth <br /> after the completion of the resurfacing project. 12 Min, <br /> 9. Five (5) Portland Cement Concrete driveways require 0.30' Asphalt Concrete over Variable depth Asp is Concrete <br /> sowcutting and removal prior to placement of asphalt shaped and compacted native over existing paved drive". <br /> v, concrete driveways, as directed by the Engineer. material. <br /> Payment for sawcutting and removal of Portland CementTYPE D TYPE E <br /> o Concrete will be by Item No. 9, Driveways (Type D). <br /> EPortland Cement Concrete driveways are as follows: <br /> Learned Avenue (Sta. 6+66 Lt., Sto. 7+54 Lt., and <br /> p Sta. 17+31 Rt.). Hall Avenue (Sta. 8+24 Lt.), and TYPICAL DRIVEWAYS <br /> Munford Avenue (Sto. 17+31 Rt.) <br /> m l <br /> z <br /> 0 <br /> CO()NW OF SAN JOAQUIN NO SCALE CONSTRUCTION TES MUN ShoeAINO DETAILS 7 of No. <br /> /� �,gD�RA/�WN BIyQ DATE PROJECT ENGINEER DATE CHECK/ED DATE SU /ITTED DATE APPROV OMMENDED y_TE <br /> Ca-,et %' �^W" ��99 --� 3�9 G J/3 1 3�?�" <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.