Laserfiche WebLink
Finished grade <br /> See Note Below — iirMc afi�c — <br /> �EFpxisting <br /> Surfoc8 <br /> Select native or imported material <br /> (909 Relative Compaction) '.. <br /> Var. <br /> — 1.00 Asphalt Concrete <br /> PAVEMENT REPAIR DETAIL O <br /> I_— <br /> Note: Width, length and locations to <br /> be determined by the Engineer. O.D.+2' <br /> TICAL TRENCH BACKFILL <br /> Pipe Cross Drain Extensions <br /> at Forest Lake Rd. (West) <br /> n <br /> v � <br /> Conform ® E.P. Conform ® E.P. <br /> 12 Min. Conform Conform <br /> Existing Width Conform to <br /> existing width <br /> N 0.30' Asphalt Concrete over shaped and Variable depth Asphalt Concrete <br /> compacted native material. over existing paved driveway. <br /> R = Conform to existing radii <br /> s <br /> TYPE D TYPE E <br /> DRIVEWAY DETAILS `z -w� -S <br /> COUNTY OF SAN JOAQUIN sc�E CONSTRUCTION DETAILS LOWER SACRAMENTO ROAD RESURFACING Sheet No. <br /> Jahant Rood (E) to Soaametto County 14 of 1 fi <br /> DRAM BY DATE I PROJECT ENCRIEEIt DATE CHECKED DATE SlleApM DATE COYAIENDED DA <br />