My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1982 - SP1988
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP1982 - SP1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 12:09:14 PM
Creation date
1/23/2016 12:31:45 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Lone Tree Road Resurfacing
Limits
Jack Tone Road to Sexton Road
Year
1999
Project Engineer
Jose Zepada
Roads Worked
Lone Tree Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1982 - SP1988
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ADJUST MONUMENT FRAMES do COVERS EARTHWORK ASPHALT CONCRETE (TYPE B) <br /> Location Quantity (ROADWAY WIDENING) Location Quantity <br /> Stu. 52+05 (11' Rt.) 1 Ea. Intersections 301 Tons <br /> Sta. 157+71 ( rt Wagner Road) 1 Ea. Location Quantity <br /> Pavement Repair 280 Tana <br /> Sta. 184+10 ( CL) 1 Ea. Driveways 518 Tons <br /> Sta. 210+56 ( (LCorrolton Road) 1 Ea. Sta. 105+00 to Sta. 156+00 (Lt. and Rt.) 102 Ste. AC Miscellaneous Amos (Dike) 12 Tons <br /> Sta. 263+53 ( CLVan Allen Rood) 1 Ea. Total 1,091 Tons <br /> Total 5 Each <br /> PAVEMENT REPAIR SHOULDER BACKING ASPHALT CONCRETE (TYPE B) LEVELING <br /> Location Quantity Location Quantity Location Quantity <br /> Sta. 0+75 to Sta. 315+00 9,440 Tons Sto. 263+60 to Sta. 295+00 667 Tons <br /> 12 locations (Throughout Project) 552 S.Y. <br /> PLANING ASPHALT CONCRETE PAVEMENT DRNEWAYS (TYPE D) PLACE ASPHALT CONCRETE DIKE E C <br /> a Location Quantity <br /> e fdaialiaa Quantity Area Location Quantity <br /> Sta. 0+75 to Ste. 0+90 40 S.Y. 48 locations 2,029 S.Y. Sta. 165+50 (Lt.) to Sto. 180+77 (u.) 1,527 L.F. <br /> e Sta. 179+95 l0 182+56 616 S.Y. Sta. 298+21 (Lt.) to Sta. 298+59 (Lt.) 38 L.F. <br /> aSta. 297+32 to Stu. 297+62 110 S.Y. <br /> e <br /> Fn Sta. 297+76 to Stu. 29a+06 110 S.Y. ��� ��+ Total 1,565 L.F. <br /> 3 Sto. 314+50 to Sto. 315+00 133 S.Y. DRIVEWAYS MPE E <br /> g- Intersection Quantity Area <br /> a 4 Locations throughout 248 S.Y. <br /> (2 o Carrolton Rd./2 o van Allen Rd.) 16 locations 692 S.Y. PAVEMENT REINFORCING FABRIC <br /> z Total 1,257 S.Y. <br /> ASPHALT CONCRETE (TYPE A) Location Quantity <br /> EARTHWORKLocation Quantity Sta. 0+90 to Sto. 264+00 64,314 S.Y. <br /> ' ^ - <br /> V r (MISCELLANEOUS AREAS) Mainline 14,716 Tons <br /> (Includes Widening) <br /> Location Quantity MONUMENT FRAMES do COVERS <br /> T Shoulder Detaile No. 2 Location Quantity <br /> Left Shoulder 47 Sta. <br /> - Right Shoulder 131 Sta. Sta. 78+48 ( Due Road) 1 Ea. <br /> ! Sto. 104+90 ( QMurphy Road) 1 Ea. <br /> A Total 178 Sto. Sta. 131+29 ( (t) 1 Ea. <br /> FnFn Total 3 Each <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN ND SME SUMMARY OF QUANTITIES LONE TREE ROAD RESURFACING Sheet No. <br /> (dads. Tone rood to Seaton rood): 7 of 7 <br /> DRAWN BY DATE I PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATEAPPROV OMMENDED TE <br /> Tay Kefuerzo 6/ 99 6�f/99g9 f/Ln!« ���/r� rl <br />
The URL can be used to link to this page
Your browser does not support the video tag.