My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2000 - SP2004
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2000 - SP2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 12:10:17 PM
Creation date
1/23/2016 12:32:08 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Ryde Avenue Resurfacing
Limits
Stockton City Limits to Alpine Avenue
Year
1999
Project Engineer
Kaila Coppal
Roads Worked
Ryde Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2000 - SP2004
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ADJUST MAINTENANCE HOLE 8"0 CORRUGATED <br /> FRAME AND COVER STEEL PIPE <br /> Location Quantity Location Quantity <br /> Sta. 16+ 04, 9' Rt. 1 Each Sta. 11+65 (Rt.) i5 L.F. <br /> See Note Below <br /> ..� _ _. Existing <br /> Surface <br /> t PAVEMENT REPAIR g" STORM DRAIN INLET <br /> Location Quantity CATCH BASIN <br /> 0.70' Asphalt 2 Locations 28 S.Y. Location Quantity <br /> - Concrete <br /> PAVEMENT REPAIR DETAIL Sta. „ +65 (Rt.) Each <br /> Note: Width (4' minimum), length PLANING ASPHALT <br /> and locations to be determined <br /> On by the Engineer. CONCRETE PAVEMENT <br /> Location Quantity MINOR CONCRETE <br /> o Begin and End Overlay 302 S.Y. HANDICAP RAMP <br /> Longitudinal _Plante Location Quantity <br /> '^ Sta. 11 +77 to Sta 22+36 (Lt.) 706 S.Y. <br /> i <br /> n ID Sta. 11 +50 to Sta 22+36 (RL) 1 ,208 S.Y. Michigan Ave. NE 33 L.F. <br /> m Michigan Ave. E 115 S.Y. Michigan Ave. NW 48 LF. <br /> °_ Michigan Ave. W 127 S.Y. Michigan Ave. SF 26 L..F, <br /> Total 2,458 S.Y.j Michigan Ave. SW 52 L.F. <br /> - - Total 159 L.F. <br /> (n ASPHALT CONCRETE <br /> 'tJ ; <br /> Location TYPE B) QuantityPAVEMENT REINFORCING <br /> o Ryde Ave FABRIC <br /> ^ ,> Mainline 885 Tons <br /> V Michigan Ave. Intersection 37 ions Location Quantity <br /> _ Pavement Repair 13 Tons Ryde Ave <br /> Total 935 Tons Sta. 10+78 to Sto. 22+36 4,468 S.Y.. <br /> COUNTY OF SAN JOAQUIN No SCALE SUMMARY OF QUANTITIES RYDE AVENUE RESURFACING Sheet No. <br /> (Stockton City Limits to Alpine Avenue) 5 or 5 <br /> DRAWN BY DATE I PROJECT ENG N R T'" CHECY2^'"'�r KEq�N`Yf U9IAITT�D D4TC c SRO .0 kEC N d JCcD 7A F <br /> T M Levers 6/99 —� � i��//� rr(oto� �"j <br />
The URL can be used to link to this page
Your browser does not support the video tag.