My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2005 - SP2010
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2005 - SP2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 12:16:44 PM
Creation date
1/23/2016 12:32:16 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Wagner Road Resurfacing
Limits
State Highway Route 120 to Lone Tree Road
Year
1999
Project Engineer
Dwayne Sabiniano
Roads Worked
Wagner Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2005 - SP2010
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Show annotations
View images
View plain text
GENERAL _NOTES SCHEDULE OF <br /> 7 . 0.2n' Asphalt Concrete surfacing shall be plor_ed in two (2) <br /> layers of approximate equal thickness. ROADWAY WIDENING (LEFT) <br /> 2. The Contractor shall obtain an Encroachment Permit from Caltrans vement <br /> Pa <br /> prier to work within the State hlighway Route 120 Right-of-Way. Station Widening <br /> .3. All earthwork (except for final grading of shoulders) <br /> .shall be completed prior to placing final layer of asphalt concrete. 0+48 Conform <br /> 4. Surplus material from excavation 3+00 2.0' <br /> p (roadway widening areas) is to <br /> be used as embankment throughout the project on the west side.. 6 +00 2.0' <br /> 9+00 2.3' <br /> 5. Surplus material from excavation (earthwork miscellaneous areas) is 12+CO 2.D' <br /> to be placed immediately adjacent to the excavated areas; most of 15+00 2.3' <br /> east side uses this material for irrigation berms. 18+00 2.6' <br /> 6. Place Survey Monument Frames and Covers at the following 21 +00 1 .7' <br /> locations: Sto. 26+45t, Sta. 52+983 and Stu. 79+45t. 24+00 1 .2' <br /> Exocf Locations to be determined by the Engineer. 27+00 L3' <br /> 7. All earthwork, except for the final lift of shoulder backing, shall 30+00 1 .4' <br /> be completed prior to placing the final lift of asphalt concrete 33+00 1 .3' <br /> surfocing. No shoulder backing shall be deposited or drifted 36+00 1 .0' <br /> on the final lift of asphalt concrete surfacing. 39+00 12' <br /> 8. At locations within 50' of roadway intersections, the contractor 42+00 1 .0' <br /> sholl scarify native soil adjacent to pavement to a depth of 45+00 1 .0' <br /> 6 inches and blend shoulder backing material prior to compaction. 48+00 1 .3' <br /> i n <br /> o <br /> 52+42 1 .0' <br /> 9. The A.C. Leveling and A.C. Widening may be placed at the same time. <br /> Placement of Asphalt Concrete surfacing shall not begin until the 53+35 1 .4' <br /> asphalt concrete used in the Asphalt Concrete Leveling has been In 57400 1 .5' <br /> place a minimum of 12 hours. 60+00 1 .0' <br /> `^ 63+00 1 .5' <br /> -- t rn - _. 66+00 1 .8' <br /> rs 69+00 1.2' <br /> -- r 72 +00 1 .4' <br /> 76+00 1 .0' <br /> 79+00 1 .9' <br /> I {{ - 82 +00 1 .9' <br /> 85+00 1 .5' <br /> 0 <br /> r 91+00 1 .5' <br /> t, 94+00 2.0' <br /> 98 too 1 ,5' <br /> 101 +00 1 .5' <br /> m (To be installed by others) 104+00 2.1 ' <br /> SURVEY MONUMENT DETAIL 105+00 Conform <br /> COUNTY OF SAN JOAQUIN III SCALE GENERAL NOTES WAGNER ROAD RESURFACING sheet No. <br /> AND CONSTRUCTION DETAILS (State Highway Route 120 to Lone Tree Road) 2 of 6 <br /> DRAWN BY DATE PROJECT ENGINEERDAT CHE KED DATE SUBMTTED DATE APPR RECOMMENDED DATE <br /> ,/c�9 1 j�( �/11 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).