My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2018 - SP2026
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2018 - SP2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 12:26:32 PM
Creation date
1/23/2016 12:32:39 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Live Oak Road Resurfacing
Limits
Central Calfornia Traction Co. R.R. to State Route Highway 88
Year
1999
Project Engineer
Sam Adiong
Roads Worked
Live Oak Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2018 - SP2026
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES £ <br /> Cant. <br /> 1. Asphalt Concrete surfacing shall, be placed in 2 layers of Limits of Clearing and Grubbing <br /> approximately equal thickness. Pavement Reinforcing Fabric and Mailbox Relocation. <br /> shall be placed between the layers. <br /> 2. Placement of Asphalt Concrete Surfacing shall not 12 12 - <br /> begin until asphalt concrete used in pavement Shoulder Detail Shoulder Detail <br /> repair has been in place for 36 hours. See this Sht. See this Sht. <br /> 3. Survey Monument Frame and Cover shall be adjusted 22 Pavement Reinforcing Fabric <br /> to finished grade at Sta. 154+563 and Sta.181+253. <br /> 4. Place Survey Monument Frame and Cover at Sta. 48+923 <br /> Exact location to be determined by the Engineer. _�o �o—a <br /> 5. Contractor shall obtain an Encroachment Permit from Caltrans <br /> for work and traffic control prior to start of construction <br /> operations within the State R/W at State Route 88. <br /> 0.25' A.C. Overlay <br /> Existing ROadwO <br /> £ TYPICAL SECTION <br /> CaArt Sta. 46+80 to Sta. 214-hB5 <br /> o --✓� 3 -4 <br /> 12' �. . . <br /> z n I d Cmsf. ' <br /> 8 b E <br /> Finished Surface o 12' 4' 4' <br /> �0 SHOULDER DETAIL SCHEDULE <br /> c — _ Location Type <br /> Finished Surface <br /> YExist. <br /> sta. sa+oo to sta. fio+so (Lt.) z <br /> Sta. 101+25 to Sta. 109+50 (Lt. & Rt.) 2 BsConform <br /> Shoulder Backing (Typ.) StO. 113+00 to Sta. 118+50 (Lt.) 2Sto. 118+70 to Sta. 125+00 (Lt.) 2 Ditch Line Sto. 131+75 to Sta. 165+30 (Lt.) 2 <br /> N Note: Maintain existing ditch free of <br /> (Typ.) <br /> 0 9 Sta. 135+00 to Sto. 165+30 (Rt.) 2 Shoulder Backing (Typ.) <br /> foreign materials and restore Sta. 172+00 to Sta. 182+00 (Lt.) 2 <br /> to original condition. <br /> m Typical shoulder detail is Type `7 SHOULDER DETAIL — TYPE 1 <br /> 0 <br /> SHOULDER DETAIL — TYPE 2 unless noted otherwise. <br /> z <br /> F LIVE OAK ROAD RESURFACING Sheet No. <br /> m COUNTY OF SAN JOAQUIN sCALE TYPICAL SECTION (C.C.T. Co. R.R. to State Route Highway a 2 of 9 <br /> DRAWN BY DATE I PROJECT ENGINEER I DATE CHECKED ,,D//ATE SUBMRTED DATE I AP COMMENDED DATE <br /> DSnyvs .J�iFo 6/99 / 7�J�f ouea; /j _ I If <br />
The URL can be used to link to this page
Your browser does not support the video tag.