My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2027 - SP2033
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2027 - SP2033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 8:34:41 AM
Creation date
1/23/2016 12:32:51 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Walnut Grove Road Resurfacing
Limits
South Fork of Mokelumne River to Blossom Road
Year
1999
Project Engineer
Sam Adiong
Roads Worked
Walnut Grove Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2027 - SP2033
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conform ® E.P. <br /> PAVEMENT REPAIR DRIVEWAYS <br /> ouontay1 <br /> Location Quantity Type No. Anxo <br /> 2 Sites Throughout Project 130 S.Y. D 23 719 S.Y. <br /> Existing Width Conform E 11 1062 S.Y. <br /> 12' Min. <br /> 0.30' Asphalt Concrete over shaped ASPHALT CONCRETE <br /> and compacted native material. ASPHALT CONCRETE TYPE A <br /> TJ? PLANING Location Ouont;ty <br /> Location Quantity Mainline 7,392 Tons <br /> Bridles East Approach Pavement Repair 43 Tons <br /> R = Conform to Ste. 8W+02 to Ste. 7W+87 53 S.Y. Total 7,435 Tons <br /> Conform ® E.P. Exist. radius Intersections <br /> Walnut Grove Court 22 S.Y. <br /> o Lamp Road 33 S.Y. <br /> Vail Road 33 S.Y. ASPHALT CONCRETE <br /> s' Longitudinal TYPE B <br /> Ste. 1W+76 to Ste. 7W+42 511 S.Y. <br /> b (Lt. & Rt.) Location Quantity <br /> End of Project <br /> a V\ Existing Width Conform Sto. 116+50 to Ste. 117+00 178 S.Y. Intersections 62 Tons <br /> 12' Min. Driveways 288 Tons <br /> Tocol 630 S.Y. <br /> h Taal 330 Tons <br /> �$ I Variable depth Asphalt Concrete <br /> _ tv over existing paved driveway. <br /> ° PAVEMENT REINFORCING <br /> TYPE E FABRIC <br /> SHOULDER BACKING Location ova,tity <br /> o TYPI AL DRNEWAYS Location Quantity 7W+52 00 <br /> Ste. 0+00 to Ste. 5 31,3 S.Y. <br /> Ste. 1+76W to Ste. 117+00 4,692 Tom Taal 33,136 S.Y. <br /> COUNTY OF SAN JOAQ UIN ii sm SUMMWY OF WMMW-S "'" <br /> GROVE 'SAD tsuRF�c sheet 7 <br /> (South Fork IlohsMm+n9 River to flls99entrl IEead) 7 of 7 <br /> DRAWN BY DATE 1 PROJECT ENa9/EER DATE I CHECKED DATE Sl1BMITTED I DATE RECOMMENDED DATE <br /> 6/99 sem„, A-4-4 �44 4t <br /> _ J <br />
The URL can be used to link to this page
Your browser does not support the video tag.