My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2080 - SP2089
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2080 - SP2089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 8:38:58 AM
Creation date
1/23/2016 12:34:02 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Devries Road Resurfacing
Limits
Thornton Road to State Highway Route 12
Year
1999
Project Engineer
D. Sabiniano
Roads Worked
Devries Rd.
Red Lines
No
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2080 - SP2089
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES <br /> 1 . Placement of asphalt concrete surfacing shall not 7. At locations within 50' of roadway intersections, the <br /> begin until the asphalt concrete used in pavement contractor shall scarify native soil adjacent to pavement <br /> has been in place for 36 hours. to a depth of 6 inches and blend shoulder backing <br /> 2. All Pavement Repair must be completed one day material prior to compaction. <br /> prior to placement of Asphalt Concrete. 8. Maintenance Hole and Utility Valve frames and covers shall <br /> 3. Asphalt concrete shall be placed in two (2) layers of be adjusted to finished grade by the owner of the facility <br /> approximate equal thickness with pavement reinforcing after completion of the resurfacing project, unless otherwise <br /> noted. <br /> fabric placed between the layers. <br /> 4. The contractor shall obtain an encroachment permit <br /> from Caltrans prior to work within the State Highway <br /> Route 12 Right—of—Way. <br /> 5. The contractor shall conduct his shoulder backing <br /> operation as to not disturb or obstruct any existing <br /> drainage. _ <br /> 6. All earthwork, except for the final lift of shoulder backing, <br /> shall be completed prior to placing the final lift of asphalt <br /> o concrete surfacing. No shoulder backing shall be deposited <br /> '+ or drifted on the final lift of asphalt concrete surfacing. <br /> % m <br /> m' z <br /> < i <br /> m <br /> CP <br /> v <br /> V <br /> t,3 <br /> ryryO� o <br /> V�� F <br /> J MX <br /> m <br /> z <br /> O <br /> COUNTY OF SAN JOAQUIN No SCALE GENERAL NOTES DEVs Road <br /> ROAD RESURFACING sheet 10 <br /> (Thornton Road to State Highway Route 12) 3 of 10 <br /> DRAWN BY DATE /PROJECT ENGINEER I DATE CHECKED DATE SU MITTED DATE AP;RECOMMENDED DATE <br /> 17.6. Sabnlan �O/•��'M 714„11., CAftV C �O�u f9 N4r� �"� [S�!'! <br />
The URL can be used to link to this page
Your browser does not support the video tag.