Laserfiche WebLink
GENERAL NOTES <br /> 1 . Placement of asphalt concrete surfacing shall not 7. At locations within 50' of roadway intersections, the <br /> begin until the asphalt concrete used in pavement contractor shall scarify native soil adjacent to pavement <br /> has been in place for 36 hours. to a depth of 6 inches and blend shoulder backing <br /> 2. All Pavement Repair must be completed one day material prior to compaction. <br /> prior to placement of Asphalt Concrete. 8. Maintenance Hole and Utility Valve frames and covers shall <br /> 3. Asphalt concrete shall be placed in two (2) layers of be adjusted to finished grade by the owner of the facility <br /> approximate equal thickness with pavement reinforcing after completion of the resurfacing project, unless otherwise <br /> noted. <br /> fabric placed between the layers. <br /> 4. The contractor shall obtain an encroachment permit <br /> from Caltrans prior to work within the State Highway <br /> Route 12 Right—of—Way. <br /> 5. The contractor shall conduct his shoulder backing <br /> operation as to not disturb or obstruct any existing <br /> drainage. _ <br /> 6. All earthwork, except for the final lift of shoulder backing, <br /> shall be completed prior to placing the final lift of asphalt <br /> o concrete surfacing. No shoulder backing shall be deposited <br /> '+ or drifted on the final lift of asphalt concrete surfacing. <br /> % m <br /> m' z <br /> < i <br /> m <br /> CP <br /> v <br /> V <br /> t,3 <br /> ryryO� o <br /> V�� F <br /> J MX <br /> m <br /> z <br /> O <br /> COUNTY OF SAN JOAQUIN No SCALE GENERAL NOTES DEVs Road <br /> ROAD RESURFACING sheet 10 <br /> (Thornton Road to State Highway Route 12) 3 of 10 <br /> DRAWN BY DATE /PROJECT ENGINEER I DATE CHECKED DATE SU MITTED DATE AP;RECOMMENDED DATE <br /> 17.6. Sabnlan �O/•��'M 714„11., CAftV C �O�u f9 N4r� �"� [S�!'! <br />