Laserfiche WebLink
�- Const. <br /> I <br /> • Limits of Clearing and Grubbing <br /> 2- 4 12'-26'— I —12'-16' <br /> 2 -16 4. _ 4, ,-2, <br /> 24' Pavement Reinforcing Fabric <br /> Conform ��o( '8 Var. _ Var. I Var. _ Vor. Conform <br /> ---------------- -------- ---------- <br /> ---- - <br /> Backing (Typ.) Existing Roadway— <br /> TYPICAL SECTION 0.25' Asphalt Concrete Overlay <br /> Sta. 492+80 to Sta. 520+70 <br /> Sta. 498+50 to Sta. 580+82 (Right side only) 0.21' Asphalt Concrete Overlay <br /> Stu. 500+82 to Sta. 584+00 Sta. 520+70 to Sta. 584+00 <br /> e <br /> -a Limits of Mailbox Relocation <br /> 0 <br /> n <br /> n <br /> m <br /> GENERAL NOTES <br /> 0 � <br /> 1. Asphalt concrete shall be placed as noted below: 4. Shoulder Backing material at intersection radii shall be <br /> a 0.17' Thickness — One (1) layer with Pavement Reinforcing blended with the top 6" of native soil material as directed <br /> o Fabric on existing pavement. by the Engineer. Payment for blending shall be considered as <br /> W 0. 21' Thickness — Two (2) layer of approximate equal thickness included in the contract unit price paid for Shoulder Backing. <br /> with Pavement Reinforcing Fabric between layers. <br /> 0.25' Thickness — Two 2 layer of approximate equal thickness 5. The contractor shall conduct Shoulder Backing operation <br /> ( ) Ye pP q such as not to disturb or obstruct any existing drainage. <br /> with Pavement Reinforcing Fabric between layers. <br /> / n 2. All Pavement Repair must be completed one day prior 6. Utility Frames and Covers shall be adjusted to grade by others <br /> CPto placement of Asphalt Concrete. after the resurfacing project is complete. <br /> v <br /> 3. When paving asphalt concrete frontages, the <br /> N +� Contractor shall not obstruct existing valley gutters. t <br /> .D <br /> T z i2/6�o0 <br /> v � <br /> COUNTY OF SAN JOAQUIN No SCALE TYPICAL SECTION AND CHEROKEE ROAD RESURFACING Sheet No. <br /> GENERAL NOTES (State Highway Route 99 to La oro Road 3 of 9 <br /> DRAWN BY DATE PROJECT Ba*B2 DATE CKED DATE Si BWTIED I DATE DA <br />