My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2108 - SP2114
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2108 - SP2114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 8:40:35 AM
Creation date
1/23/2016 12:34:39 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Comstock and Fine Roads Resurfacing
Limits
Wall Road to State Highway Route 26
Year
2000
Project Engineer
Dwayne Sabiniano
Roads Worked
Comstock Rd., Fine Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2108 - SP2114
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Show annotations
View images
View plain text
rL Const. <br /> Limits of Clearing and Grubbing, Mailbox Relocation and <br /> Nil Earthwork (Miscellaneous Areas) <br /> 2' 2' <br /> 4, 12' •12' <br /> Ditch Grade <br /> Ste. 387+00 to Ste. 393+00, Lt. 22' Pavement Reinforcing Fabric <br /> Conform Conform <br /> BR .� <br /> \ .Var <br /> Var. �r — <br /> Va <br /> - - - -- - --- - - - - - <br /> r _ - . <br /> J 2 <br /> � Existing Roadway <br /> /Imported Borrow or A0.25' Asp y halt Concrete Overlay Imported Borrow or <br /> excess material from excess material from <br /> shoulder excavation. 0.25'± Shoulder Backing shoulder excavation. <br /> R0.25'± Shoulder Backing <br /> u * Variable width (Ste. 384+75 to Ste. 389+75) TYPICAL SECTION <br /> 3 „ • Refer to Sheet 4 for thickness variations. Ste. 333+50 to Ste. 447+86 <br /> x • Variable x—slope (Ste. 388+00 to Ste. 389+75, Lt.) <br /> I <br /> o m <br /> v <br /> a <br /> GENERAL NOTES <br /> 1. Contractor shall scarify native soil adjacent to pavement to a 4. Asphalt Concrete shall be placed as noted below: 6. Where superelevatons exist on horizontal curves, <br /> depth of 6 inches and blend shoulder backing material prior to 0.25' Thickness — Two (2) layers of approximate equal surface slope and drainage shall conform with <br /> compaction. Limits of this work is confined to intersection radii thickness with pavement reinforcing fabric between the the existing. <br /> plus 50' each direction. Payment for blending shall be considered layers. <br /> as included in the contract unit price paid for shoulder backing. <br /> 0.40'-0.75'± Thickness — Three (3) layers with the 7. Contractor shall obtain an encroachment <br /> 2. All earthwork, except for final lift of shoulder backing shall be pavement reinforcing fabric between the second and permit from Coltrans prior to performing work <br /> w completed prior to placing the final lift of asphalt concrete third layers. The first layer in this area can be placed within their right—of—way. <br /> p surfacing. the same day as the first layer of the two layer <br /> 3. Imported Borrow shall be equal to or better than the native sections. <br /> material. R—Value and sand equivalent requirements shall be <br /> z waived for this material. 5. Placement of asphalt concrete surfacing shall not begin <br /> until the asphalt concrete used in pavement repair has <br /> Fn been in place far one day. <br /> Z <br /> 0 <br /> COUNTY OF SAN JOA UIN NO SCALE TYPICAL SECTION AND COMSTOCK AND FINE ROADS RESURFACING Sheet No. <br /> Q GENERAL NOTES (Wall Road to State Highway Route 26) 2 Of 7 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMRTED DATE APP RECOMMENDED DATE <br /> 1713, Sabi ano12/gg yl:.. Z/j °` a� <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).