Laserfiche WebLink
PAVEMENT REPAIR SHOULDER BACKING PLACE SURVEY MONUMENT <br /> Location Ouontity Location Quantity FRAME AND COVER <br /> Ste. 0+05 to Ste. 13+44 55 Tons Location QYantity <br /> 13 Sites Troughout Project 473 S.Y Ste. 13+76 to Ste. 99+55 2,425 Tons Ste. 20+69t 1 Each <br /> Total 2.490 Tons Ste. 47+103 1 Each <br /> Sta. 73+55t 1 Each <br /> PLANING ASPHALT Total 3 Each <br /> CONCRETE PAVEMENT <br /> Location Quantity DRIVEWAYS <br /> Beg. Project 122 S.Y. <br /> Ste. 0+20 to 13+00 1181 S.Y. Type No. Arco ADJUST MANHOLES <br /> Ste. 13+00 to 13+44 149 S.Y. D 2 54 S.Y. <br /> Quantity <br /> Ste. 13+76 to 13+86 68 S.Y. E 18 783 S.Y. LACOt10n <br /> Ste. 13+86 to 20+70 580 S.Y. Ste. 4+21t O t= 1 Each <br /> Intersections 184 S.Y. Ste. 10+933 O rt 1 Each <br /> End of Project 40 S.Y. ASPHALT CONCRETE Ste. 13+90t O 20' Rt. 1 Each <br /> f Total 2,324 S.Y. TYPE B Ste. 16+303 O 19' Rt. 1 Each <br /> Location Quantity Totol 4 Each <br /> ADJUST SURVEY MONUMENT Mainline 4710 Tons <br /> � FRAME AND COVER Intersections 93 Tons <br /> j Pavement Repair 187 Tons <br /> �i Location Quantity Driveways (Type D) 11 Tons <br /> b Sta. 16+32t 1 Each Driveways (Type E) 93 Tons <br /> Ste. 19+39t 1 Each <br /> Total 5094 Tons <br /> Total 2 Each <br /> PAVEMENT REINFORCING <br /> A EARTHWORK (MISC. AREAS) FABRIC y _ ) <br /> i Location Quantity Location <br /> r Ste. 0+55 to 12+00 3,053 S.Y. <br /> g Ste. 24+00 to 29+50 (Rt.) 5.5 Ste. Ste. 12+00 to 13+00 244 S.Y. <br /> Ste. 64+50 to 69+00 (Rt.) 4.5 Ste. Ste. 14+16 to 99+55 20,751 S.Y. <br /> Ste. 67+50 to 72+00 (Lt.) 4.5 Ste. Intersections 133 S.Y. <br /> Ste. 85+00 to 99+55 (Rt.) 14.5 Ste. <br /> Total 29.0 Ste. Total 24,191 S.Y. <br /> COUNTY OF SAN JOAQUIN NQ scou SUMMWY OF ouWrnES ° ' iW RESURFACING Set <br /> ,� jOF 7 <br /> DRAWN BY DATE PROJECT ENGINEER I DATE CHECKED DATE SUBMITTED DATE APPROVAL RECOMMENDED p4TE <br />