My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2218 - SP2226
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2218 - SP2226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 8:47:51 AM
Creation date
1/23/2016 12:37:17 AM
Metadata
Fields
Template:
Small Plans - SP
Project
North 99 Frontage Road (West) Resurfacing
Limits
600' +/- South of Eight Mile Rd. to City Limits
Year
2001
Project Engineer
Vincent Li
Roads Worked
North 99 Frontage Rd. (West)
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2218 - SP2226
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 � ' <br /> REMOVING CONCRETE DRIVEWAYS (TYPE E) METAL BEAM GUARD RAILING <br /> n N Location Quantity Location Quantity Location Quantity <br /> _ Y <br /> r Sto. 44+41 to Sta. 45+41 (Rt.) 100 L.F. 8 Locations 528 S.Y. Mosher Slough (SR. No. 29C-66) <br /> I Sta. 46+46 to Sta. 47+46 (Rt.) 100 L.F. NW Corner 25 L.F. <br /> f Total 200 L.F. NE Corner 25 L.F. <br /> 33 ASPHALT CONCRETE (TYPE A) SE Carver 25 L.F. <br /> I Location Quantity Total 75 L.F. <br /> 21 PAVEMENT REPAIR <br /> Mainline Resurfacina <br /> Location Quantity Sta. 36+00 to Stu. 94+30 3,555 Tons \ <br /> 20 Locations (Throughout Project) 1,000 S.Y. TERMINAL SYSTEM (TYPE SRT) <br /> 0. <br /> ASPHALT CONCRETE (TYPE B) Location Quantity f <br /> „ <br /> PLANING ASPHALT CONCRETE PAVEMENT Location Quantity Mosher slough (BR. No. 29C-65) <br /> B NW Corner 1 Ea. <br /> Location Quantity Pavement Repair 477 Tons NE Corner 1 Ea. <br /> F n Driveways (Type D h E) 108 Tons SE Corner 1 Ea. <br /> Mainline <br /> Dike Types "C" and "F" 2 Tons <br /> Total 3 Ea. <br /> N Sta. 36+00 to Sta. 36+40 142 S.Y. Total 587 Tons <br /> 'm m <br /> Sta. 44+91 to Sta. 45+51 187 S.Y. <br /> Sta. 46+34 to Sta. 46+58 62 S.Y. <br /> m Sta. 94+15 to Sta. 94+30 67 S.Y. PLACE ASPHALT CONCRETE DIKE TERMINAL SECTION (TYPE A) <br /> i Total 458 S.Y. <br /> Location Quantity Location Quantity <br /> a <br /> Mosher Slouah (SR. No. 29C-66) Mosher Slouch (BR. No. 29C-66) <br /> SHOULDER BACKING NE corner 00 L.F. NW Corner 1 Ea. <br /> SE Corner 100 LF. <br /> Location Quantity SW Comer NE corner 1 Ea. <br /> 20 L.F. SE Corner i Ea. <br /> Sta. 36+00 to 94+3DLt. Total 220 L.F. <br /> ( ) 498 Tons Total 3 Ea. <br /> l n Sta. 89+96 to Sta. 94+30 (Rt.) 48 Tons <br /> v� Total 546 Tons <br /> PAVEMENT REINFORCING FABRIC <br /> Location Quantity PLACE SURVEY MONUMENT <br /> Y-� DRIVEWAYS (TYPE D) Mainline FRAME AND COVER <br /> M. Location Quantity Sta. 36+00 to Sta. 45+41 2,536 S.Y. Location Quantity <br /> Sta. 46+34 to Sta. 94+30 12,789 S.Y. <br /> r <br /> 7 Locations180 S.Y. Total 15,325 S.Y. Sta. 66+27 (* Waller Road Intersection) 1 Ea. <br /> 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES NORTH 99 FRONTAGE ROAD (WEST) RESURFACING Sheet No. <br /> (600�t South of Eight Mile Road to City Limits) 9 Of 9 <br /> DRAWN BY DATE I PR ECT ENGINEER I DATE CHECKED DATE SUBMITTED DATE APPR VA OMMENDED DATE <br /> Vjrccd Li Jon 0/ (yl <br /> 'm/o/ �h 0 s ! / )Al' <br />
The URL can be used to link to this page
Your browser does not support the video tag.