Laserfiche WebLink
N <br /> New E.P. (R=90') <br /> 2' —" Ii <br /> Exist E.P. <br /> y <br /> R.&D. concrete footing <br /> l <br /> Install 18" S.D.I. <br /> Stu.-0+40', 40' Lt. <br /> Elel / Inv. E263Jf <br /> f <br /> Inv. lev.=260.2f <br /> 70' sir Fenceline to remain in place (Typ.) <br /> R.&D. 1300 S.Y. exist. A.C. shoulder <br /> Q '�.--- to 0.5' depth <br /> Exist. gate post to remain in place (Typ.) <br /> li + 2. <br /> 0 I 1 <br /> 0 Install 90 L.F. 18"0 R.C.P. E.P. <br /> v <br /> `W `. <br /> 3 r^+ <br /> R.&D. exist. cross drain p, <br /> LEGEND -a <br /> J <br /> F717 Pavement Repair (Type 2) <br /> Note: See County Improvement Standard 1 c4 <br /> CW—D14 for drain details. <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMR7ED DATE 7APPRONAL R COMMENDED DATE ENTRANCE 0 HILL SANITARY LANDFILL <br /> Me�fu/ t�G ,�„ 3/09 COUNTY OF SAN JOAgIN UNO SCALE ENTRANCE ROAD 4 7 <br /> RESURFACING <br />