My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2252 - SP2263
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2252 - SP2263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 8:50:57 AM
Creation date
1/23/2016 12:38:06 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Copperopolis Road Resurfacing
Limits
Duncan Road to Hewitt Road
Year
2001
Project Engineer
Dwayne Sabiniano
Roads Worked
Copperopolis Rd.
Red Lines
No
Federal #
STPL-5929(112)
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2252 - SP2263
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18" DIAMETER REINFORCED METAL BEAM GUARD RAILING <br /> CONCRETE PIPE (CL V) <br /> Location Quantity Location Quantity <br /> Sta. 484+72f 68 L.F. BR. 29C-213 (North Branch Channel "A" <br /> 3 Quadrants 75 L.F. <br /> i <br /> 30" DIAMETER REINFORCED <br /> CONCRETE PIPE (CL IV) SINGLE THRIE BEAM BARRIER <br /> Location Quontity <br /> o Sto. 330+30 (25 Lt.)t 20 L.F. <br /> Location Quantity <br /> 0 <br /> 8R. 29C-213 (North Branch Channel "A" <br /> p n <br /> a o North side 84'-4.5" (L.F.) <br /> 22"X13 CORRUGATED South side 81 '-3.0" (L.F.) <br /> D STEEL PIPE—ARCH (0. 109" THICK) Total 165-7.5" (L.F.) <br /> m Location Quantity <br /> ° Sto. 462+37 (30' Lt.)t 12 L.F. <br /> o Sta. 462+98 (30' Lt.)t 12 L.F. <br /> Sto. 462+80 (30' Rt.)+ 10 L.F. <br /> 8 Total 34 L.F. TERMINAL SYSTEM (TYPE ET) <br /> Location Quantity' <br /> 0 <br /> i BR. 29C-213 (North Branch Channel "A") <br /> 12" DIAMETER CORRUGATED 3 Quadrants 3 Each <br /> STEEL PIPE (0. 109" THICK) <br /> V• Location Quantity <br /> 'b Sto. 483+11 (25' Rt.)t 9 L.F. ESSI <br /> 1 � �JEL <br /> QUADGUARD SYSTEM 24" (5—BAY) <br /> 0 <br /> i 18" DIA. STORM DRAIN INLET (SDI) Location Quantity C.y. 3/31/02 <br /> n Location Quantity BR. 29C-213 (North Branch Channel "9T FBF CIVIL Sta. 356+80 (30' Rt.)t Lump Sum Northwest quadrant 1 Each CALIF'3 <br /> Z <br /> 0 <br /> COUNTY OF SAN JOAQUIN No SCALE SUMMARY OF QUANTITIES FCOPPEROPOLIS ROAD RESURFACING I Sheet No. <br /> (Duncan Road to Hewitt Road) 12 of 12 <br /> DRAWN BY DATE I PROJECT ENGINEER DATE I C DATE SUBMMTED OPMENDED DATE <br /> P. 5.koi 5700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.