Laserfiche WebLink
i <br /> Const. <br /> Limits of Clearing and Grubbing and Mailbox Relocation _ <br /> i <br /> 20 <br /> 1 ' �12' 12' 8' 2'-4' * 1 ' �- <br /> Exist. Cones Curb 24' Pavement Reinforcing Fabric I <br /> to remain. <br /> Var._ -Via r. _ Var. _ /` Conform <br /> Thick <br /> GENERAL NOTES <br /> -- ---------------- Existing Roadwa J <br /> a <br /> 1. Contractor shall scarify native soil adjacent to pavement at ��------------------- ------ - - <br /> intersection radii to a depth of y and blend shoulder backing 7 <br /> material prior to compaction. Payment for blending shall be Variable depth Shoulder <br /> considered as included in the price for Shoulder Backing. g Y <br /> 0.25' Asphalt Concrete Overlay Backing To Imparted <br /> 2 Existing drainage facilities shall remain in place unless otherwise Borrow (Topsoil) <br /> noted. The Contractor shall conduct earthwork operations so as <br /> not to modify or abstract the existing drainage. TYPICAL SECTION <br /> 3. All shoulder work (except for final shoulder grading) shall be Sta. 0+23 t0 Sta. 112+21 <br /> m completed prior to placing final lift of asphalt concrete. <br /> a4. Asphalt Concrete used for Pavement Repair shall not be placed <br /> p in layers which exceed 0.50' in compacted thickness. Note: Conform to exist cross—slopes <br /> and super elevations. <br /> n 5. Placement of asphalt concrete surfacing shall not begin until <br /> m the asphalt concrete used in pavement repair has been in <br /> - � place for 12 hours. <br /> n <br /> 0 6. Asphalt Concrete shall be placed in two (2) layers of approximate Center place Monument <br /> <a equal thickness with pavement reinforcing fabric placed on the SHOULDER SCHEDULE F&Cmon to over exist. Cal <br /> existing surface. monument. Refer <br /> a Location * Width Material S.J. Co. Std. Dwg. C CW—M1 <br /> 3 7. The Contractor shall obtain an Encroachment Permit from <br /> o Caltrans for work and traffic control within the State's Sta. 0+23 to Ste 4+94 (Lt.) 2' Shoulder Backing <br /> right of way. Ste. 4+94 to Sto 110+21 (Lt.) 0' Exist. P.C.C. Curb New Overlay <br /> S. Where superelevations exist on horizontal curves, the new Sta. 110+21 to Ste 112+21 (Lt.) 2' Shoulder Backing Surface <br /> p surface slope and drainage shall conform to existing or <br /> om as directed by the Engineer. Ste. 0+23 to Stu 25+00 (Rt.) 4' Shoulder Backing --- - <br /> ro 9. All existing trees, shrubs, fences, concrete walks and other Ste. 25+00 to Ste 27+50 (Rt.) 2' Import Borrow (Topsoil) <br /> frontage improvements are to remain in place unless otherwise Ste. 27+50 to Ste 41+50 (Rt.) 2' Shoulder Backing <br /> noted. Sta. 41+75 to Ste 46+00 (Rt.) 2' Import Borrow (Topsail) <br /> i 10. Payment for removal and disposal of drainage pipes where Ste. 46+00 to Ste 54+00 (Rt.) 2' Shoulder Backing <br /> iW m indicated on the plans shall be considered as included in Sta. 54+00 to Ste 55+00 (Rt.) 2' Import Borrow (Topsoil) 3" 2"f <br /> Clearing and Grubbing. <br /> Z Stu. 55+00 to Stu 57+00 (Rt.) 2' Shoulder Backing <br /> P 11. Imported Barrow (Topsoil) shall be placed in shoulder areas Sta. 57+00 to Ste 73+00 (Rt.) 4' Shoulder Backing Existing Roadway <br /> with existing sod frontage as noted on the Shoulder Schedule. <br /> Sta. 73+00 to Sta 86+80 (Rt.) 2' Shoulder Backing <br /> 12. Monuments frames and covers shall be placed at the following Ste. 86+80 to Ste 110+00 (Rt.) 4' Shoulder Backing <br /> M locations: Ste. 55+66, Sta. 56+30, Ste. 62+04, Sta. 68+65, Sta. 110+00 to Ste „2+2, (RL) - r Shoulder Backing SURVEY MONUMENT DETAIL <br /> Q Sta. 68+95, Sta. 73+36 and Sta. 100+43. Refer to details, <br /> this sheet. <br /> 0 <br /> Z <br /> N. 99 FRONTAGE ROAD EAST RESURFACING Sheet No. <br /> m COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION (Eight Mile Road to Armstrong Road) 2 of 10 <br /> DRAWN BY DATE PROJECT ENGINEER ED DATE CHECKDATE SUBMITTED DATE APP RECOMMENDED DATE <br />