My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2338 - SP2352
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2338 - SP2352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 8:58:17 AM
Creation date
1/23/2016 12:39:51 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Elliott Road Resurfacing
Limits
Peltier Road to State Route Highway 88
Year
2001
Project Engineer
Ken Lyder
Roads Worked
Elliott Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2338 - SP2352
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F11 Limits of Mailbox relocation. f <br /> ❑2 12' - Sta. 6+00 to Sto. 30+00 Lt. ch"ll! Q <br /> 14' - Sto. 30+00 to Sto. 57+15 Lt. Limits of Clearin and Grubbing <br /> *15' - Sto. 57+80 to Sto. 63+35 Lt. 9 9 <br /> 14' - Sto. 63+35 to Sto. 75+50 Ll. See Shoulder 0 See Shoulder <br /> 15' ' - 20' 12' - 20' <br /> 14' - Sto. 81+50 to Sto. 89+05 Lt. Details El Details <br /> 15' - Sto. 89+05 to Sta. 93+55 Lt. Var. 22' - 24' Pavement ReinforcingFabric Vor. <br /> *15' - Sto. 93+55 to Sta. 93+75 Lt. 1'-8' <br /> 14' - Sta. 93+80 to Sto. 102+57 Lt. <br /> Tra - Sta. 102+57 to Sto. 102+96 Lt. <br /> 20' - Sto. 102+96 to Sto. 107+95 Lt. Ivo, Vor_.� <br /> Tra - Sto. 107+95 to Sto. 108+41 Lt. <br /> 14' - Sto. 108+41 to Sto. 125+60 Lt. <br /> ❑3 12' - Stu. 6+00 to Sto. 30+00 Rt <br /> 14' - Sta. 30+00 to Sto. 57+15 Rt. L =Rood.oy <br /> *15' - Stu. 57+80 to Sto. 62+95 Rt.14' - Sta. 62+95 to Sto. 96+86 Rt. ExiSEC110N *0.17'-0.25' Asphalt Concrete Overlay <br /> 15' - Sto. 96+86 to Sto. 100+61 Rt. Sta. 6+00 t0 Sta. 125+6� <br /> *15' – Sto. 100+61 to Sta. 100+81 Rt. ) SID. 102+49 to 108+18 (0.17' A.C. Overlay) <br /> 15' – Sta. 100+81 to Sto. 102+49 Rt. (0.25' A.C. Overlay all other locations.) <br /> Tr <br /> a – Sto. 102+49 to Sta. 102+96 Rt. <br /> 20' – Sta. 102+96 to Sto. 107+95 Rt. <br /> Tr <br /> 4q – Sto. 107+95 to Sto. 108+41 Rt. L247WE <br /> 14 – Sto. 108+41 to SID. 113+95 Rt. <br /> 20' – St . 113+95 to St . 122+69 Rt. —15------------ <br /> 14" – Sto. 122+69 to Sto. 125+60 Rt. 1. All Earthwork (except for final grading of Class 2 Aggregate Base) shall be completed prior <br /> to placing final layer of asphalt, a lecenA. teDd'ke <br /> ® 22; — Sta. 6+50 to Sta 30+00 see snt. 14 for locations <br /> 24 — All other locations 2. Asphalt concrete shall be placed in two layers of approximate equal thickness <br /> m • Dike replacement. with pavement reinforcing fabric on the existing pavement surface. <br /> 3. Placement of asphalt concrete surfacing shall not begin until the asphalt concrete <br /> o SHOULDER SCHEDULE used in pavement repair has been in place for 12 hours. <br /> as n 4. Place Survey Monument Frame and Cover at Sto. 30+003, Sia. 45+61±, Sto. 62+023, / _ — _ _ — — — — — <br /> LOCATION TYPE Sta. 70+903, Sta. 76+053, Sta. 82+823, Sta. 87+313, Sto. 90+033, Stu. 90+973, <br /> mu, Sto. 96+583, Sta. 100+483, Sta. 102+383, Sta. 108+523, Sta. 114+293, Sta. 119+313, p <br /> St.. 6+00 to Sta. 31+50 (Lt.) 4- 4- 1 0.25' Asphalt <br /> Sto. 31+50 to St.. 53+53 (Lt.) 2' 2' t Stu. 120+953, Sto. 123+183, & 123+193. Exact Location to be determined by the Engineer. Concrete Overlay <br /> o Sts. 57+80 to St.. 63+35 (Lt.) DIKE 4 5. No Shoulder Backing behind A.C. Dikes <br /> Sta. 63+35 to Sto. 64+w 2SHOULDER DETAIL — TYPE 4 <br /> Stu. 64+50 to Sto- 70+00 (Lt.) 4' 4' 1 <br /> o Sta. 70+00 to Sto. 75+50 (Lt.) 4' 2' 1 <br /> Sta. 75+50 to Sta. 81+50 (Lt.) DIKE 4 <br /> Sta. 8f+50 to Sls. 89+05 Lt. 4' 4' 1 c <br /> o Sta. 89+05 to Sla. 9}+]5 LL DIKE 4 L �` <br /> Sto. 94+86 to Sto. 96+70 (1-C) 2' 2' 1 Called A1� Earthwork Limits of Clearing & Grubbing <br /> m Sta. 96+70 to Sta. 101+00 (LL) 4' 4' 2 <br /> z Sta. 102+49 to Sta. 108+52 Lt. pKE 4 (Mist. Arens) <br /> Sta. 108+52 to Sta. 111+50 I- 2' 2' 2 Exist.remain <br /> Sto. 111+50 to Sta. 113+95 (Lt.) 4' 4• 1 14 2-4}2-4 �.'�14' 2-4 T2-4 to remain 20 <br /> n place T <br /> W i Sta. 117+25 to Sta. 119+20 (L1.) 2' 2' 2 0 -1- 8 se ® P ( YP) <br /> n see Schedule <br /> see Shoulder 6' <br /> y Sta. 5+00 to Sto. 45+62 (M.) 2' 4' 1 f Schedule <br /> Schedule Conform <br /> Sta. 45+62 to Sto. 5}+53 (Rl.) 2' 2' 1 Finished Surface ( Finished Surface <br /> _ O Sta. 57+80 to St.. 62+95 (Rt.) DIKE 4 <br /> Ste. 64+35 to Sto. 70+00 Rl.jj 4' 4' 1 I Conform <br /> (( <br /> Ste. 70+00 to Sto. 72+50 (RL 2' 2' 1 .. _ L — <br /> Sta. 72+50 to Sts. 92+50 (Rt.) 4' 4' 1 — — — — — <br /> z Sta. 94+86 to Sta. 96+86 (Rt.) 2- 2- 1 �f` � — See Slit. 1 11 <br /> rr.�� Sta. 96+86 to S1o.102+49 (Rt) DIKE 4 — — — — — — L L — — — — — —� for Ploning detail <br /> u�i Sta. 10}+00 to Sta.108+52 R. D#KE 4 Class 2 Agrregote Base(Typ.) Class 2 Agrregole Bose(TYp-) <br /> 0 Sta. 108+52 la Sta.113+95 Rl. 4' 4' 1 <br /> z Sta. 713+96 to sta.t22+69 (Rt.) SIDEWALK 3SHOULDER DETAIL — TYPE SHOULDER DETAIL — TYPE 2 SHOULDER DETAIL — TYPE 3 <br /> COUNTY OF SAN JOAQUIN No SCALE EWOTT ROAD RESURFACING Sheet No. <br /> TYPICAL SECTION (Pettier Road to Stall Route Highway W) 2 of 15 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVAL ACOMMENDED DATE <br /> A-V- -s-s- f0/DO P� /v�V /o/a✓/a ,� r�~w f t�i7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.