Laserfiche WebLink
PAVEMENT REPAIR DRIVEWAYS (TYPE D) PAVEMENT REINFORCING FABRIC <br /> Location Quantity Location Quantity Location Quantity <br /> 106 locations (Throughout Project) 704 S.V. 8 locations 323 S.Y. Sta. 8+30 to Sta. 69+77 16,392 S.Y. <br /> (24' wide) <br /> Sta. 70+63 to Sta. 108+35 10,059 S.Y. <br /> DRIVEWAYS (TYPE E) (24' was) <br /> Total 26,451 S.Y. <br /> Location Quantity <br /> PLANING 29 locations 1,198 S.Y. <br /> ASPHALT CONCRETE PAVEMENT METAL BEAM GUARD RAILING <br /> Location Quantity <br /> aline ASPHALT CONCRETE (TYPE A) Location Quantity <br /> Sto. 8+30 to Sta. 8+80 178 S.Y. Location Quantity Calaveras River (Bridge No. 29C-147) <br /> Sta. 69+27 to Sta. 69+77 178 S.Y. North West Corner 25 L.F. <br /> Sta. 70+63 to Sta. 71+53 320 S.Y. Mainline Resurfacing North East Corner 25 L.F. <br /> Stu. 107+85 to Sta. 108+35 272 S.Y. Sta. 8+30 to Sta. 69+77 3,643 Tons South West Corner 337.5 L.F. <br /> Sto. 70+63 to Sta. 108+35 2,235 Tons South East Corner 25 L.F. <br /> Total 948 S.Y. <br /> Total 5,878 Tons. Total 412.5 L.F. <br /> 3 <br /> a > ASPHALT CONCRETE (TYPE B) <br /> Location Quantity THRIE BEAM BARRIER <br /> g i ADJUST SURVEY MONUMENT Location Quantity <br /> m FRAME AND COVER Pavement Repair 320 Tons <br /> Driveways (Types D & E) 210 Tons Calaveras River (Bridge No. 29C-147) <br /> F <br /> Location Quantity AC Miscellaneous Areas (Dike) 21 Tons North Side 100 L.F. <br /> South Side 100 L.F. <br /> j Sto. 29+67i (10' Rt.) 1 Ea. Total 551 Tons <br /> Total 200 L.F. <br /> Sta. 56+00i (12' Rt.) 1 Ea. <br /> Sta. 82+40t 1 Ea+ <br /> i <br /> m <br /> 3 Total 3 Ea. PLACE ASPHALT CONCRETE DIKE <br /> Location Quantity TERMINAL SYSTEM (TYPE ET) f�wq <br /> A.C. Dike (Type Al Location Quantity <br /> Sta. 64+75 to Sta. 68+00 (Lt.) 325 L.F. <br /> Sta. 71+55 to Sta. 74+04 (Lt.) 249 L.F. Calaveras River (Bridge No. 29C-147) <br /> Dike (Type C) North West Corner 1 Ea. a. 2 Q <br /> SHOULDER BACKING to. 68+00 to Sta. 69+75 (Lt.) 175 L.F. North East Corner 1 Ea. 'L <br /> Lo <br /> A Sta. 70+63 to Sta. 71+55 (Lt.) 92 L.F. South East Corner 1 Ea. � �Q <br /> m Location Quantity Sta. 70+59 to Sta. 73+44 (Rt.) 285 L.F. Sta. 663 (Rt.) 1 Ea. Tf. CAl)F <br /> OF 0 <br /> a Sta. 8+30 to Sta. 108+35 2,284 Tons ITotal 1,126 L.F. Total 4 Ea. <br /> z <br /> 0 o COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES EIGHT MILE ROAD RESURFACING Sheet No. <br /> (State Highway Route 88 to Jack Tone Road) 9 of 9 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHE DATE �� � /SUBMITTED DATE APPROVAL REC MMENDED DATE <br /> 10/00 �<B.�r�� 3�/p <br />