My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2369 - SP2380
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2369 - SP2380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 8:59:37 AM
Creation date
1/23/2016 12:40:33 AM
Metadata
Fields
Template:
Small Plans - SP
Project
North 99 Frontage Road East Resurfacing
Limits
Acampo Road to 1000 Ft. North of Jahant Road
Year
2001
Project Engineer
Ken Lyder
Roads Worked
North 99 Frontage Rd. (East)
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2369 - SP2380
Type
Resurfacing
Document Relationships
Acampo Road
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
consG ❑1 <br /> Limits of Clearing and Grubbing <br /> GENERAL NOTES ® r - -1r <br /> 1 . Asphalt Concrete shall be placedfollows <br /> Sta. 0+10 to 5+25, 0.17' A.C. over 0.33' A.C. Base Finished Grade A.C. <br /> Ste. 5+25 to 14+85, Ste. 47+70 to 68+50 and yer. Lar; <br /> St& 106+70 to 122+62 one lift of 0.17'. <br /> Ste. 14+85 to 47+70 and Sta.68+50 to 106+70 <br /> One lift of 0.12' over a 0.08' leveling course with pavement _ <br /> reinforcing mesh placed on top of the leveling course. r 0.33' Asphalt <br /> 0.17' Asphalt Concrete Base <br /> 2. Placement of asphalt concrete surfacing shall not begin Concrete Overlay TYPICAL SECTION <br /> until the asphalt concrete used in pavement repair has been (Ste. 0+10 to 5+25) Existing Roadway <br /> in place for 12 hours. <br /> 3. Existing trees, shrubs, fences and other frontage improvements lC <br /> to remain in place unless otherwise shown on the plans. Cansf. <br /> 0 0 <br /> 4. The contractor shall obtain on Encroachment Permit from 4 11' - 13 11 - 13' 4 <br /> Caltrans for work & traffic control in the States right way. <br /> 5. Payment for removal and/or sweeping of soil along westst eedge Finished Grade A.C. <br /> f <br /> of pavement Ste. 14+85 to 48+00 and lump <br /> sum <br /> to payment <br /> Var I V9— <br /> shall be considered as included in the lump sum payment for <br /> Clearing and Grubbing. <br /> m 6.' Payment for miscellaneous grading to provide 4' shoulder from <br /> Ste. 108+00 to 109+26 Rt. shall be considered as included - - - - - - - - - - - - - - - - - 0.17' Asphalt Concrete <br /> in the lump sum payment for Clearing and Grubbing. <br /> a TYPICAL SECTION <br /> (Sta. 5+25 to 14+85) <br /> Existing Roadway <br /> r �. jt'�' gq q1 <br /> to y ❑1 Limits of Mailbox relocation t..- '...t `.: ." A f1 ft '' (Ste. 47+70 to 68+50) <br /> rQ <br /> m <br /> o (Ste. 106+70 to 122+62) <br /> o <br /> �2 11 ' Ste. 5+25 to Ste. 9+45 Lt. �Cua F <br /> j 12' Ste. 9+45 to Ste. 15+43 Lt <br /> 13' Ste. 15+43 to Ste. 55+22 Lt. ,� - 1n ;- 13' 13' <br /> a 12' Sta. 56+60 to Sta. 68+80 Lt <br /> 13' Sta. 68+80 to Ste. 112+40 Lt. K� 'Vr' a_ <br /> 0 11' Ste. 112+62 to Ste. 122+62 Lt. <br /> 03 11 ' Ste. 5+25 to Sta. 9+45 Rt. Pavement Reinforcing Mesh 4 <br /> n 12' Ste. 9+45 to Ste. 15+43 Rt. <br /> 13' Ste. 15+43 to Ste. 51+00 Rt. Finished Grade A.C. <br /> = 11' Ste. 51 +00 to Ste. 55+22 Rt. var. var. <br /> (W m 12' Ste. 56+60 to Ste. 68+80 Rt. <br /> V 13' Ste. 68+80 to Ste. 109+26 Rt. <br /> 11 ' Ste. 109+26 to Ste. 122+62 Rt. <br /> M o - - - - - - - - - - - - - - - - - - -�.(\�\- __ _ _ i� 0.08' Asphalt <br /> ® See Planing and Shoulder details 0.12' Asphalt TYPICAL SECTION \ Leveling Course <br /> sheet 3. Concrete \_ <br /> AExisting Roadway <br /> � (Sta. 14+85 to 48+00) <br /> v, (Ste. 68+50 to 107+00) <br /> 0 <br /> z <br /> X, COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION NORTH 99 FRONTAGE ROAD EAST RESURFACING Sheet Na. <br /> (Acampo Road to 1000 Ft. North of Jahant Road) 2 of 12 <br /> DRAWN BY DATE I PROJECT ENGINEER I DATE CHECKED DATE SUBMITTED DATE I APPROVAL ECOMMENDED I DATE <br /> II��+:o�9alie 3/30 , _,Z c '1(p4t I 71Ud ) 41_16 f <br />
The URL can be used to link to this page
Your browser does not support the video tag.