Laserfiche WebLink
0.25' A.C. Overlay 0.25' A.C. Overlay <br /> Conform Sto. 3+50 22't 1 <br /> o � <br /> a <br /> a o � Z-- <br /> z QI -x <br /> 0 <br /> Conform Of 6of <br /> �t <br /> _ R&D 10± L.F. Damaged Pipe <br /> 10 <br /> Place 10 L.F.x18" Did. C.S.P. <br /> �. with coupling band, refer to S.P. D97D <br /> R-50 <br /> n (� <br /> 'L Const. SII R-60'- <br /> (i o L Const. <br /> 9 E.P. R R x xGA E.P. <br /> _'0 + R/W <br /> = PP ro <br /> n <br /> m52 53 79 A <br /> i <br /> — R R E.P.— E.P. / Q, 0A ao R W _. E.P. <br /> NI R <br /> ° "'j See sheet No. 9 for W680 <br /> Box Culvert Extensions and pipe Details. <br /> Conform 13' 13' <br /> 'I16 + Radius widening areas shall be considered <br /> 3 and paid for as Pavement Repair (Typ.) <br /> 1 h O o O <br /> V' of <br /> Q p = Variable Depth Asphalt Concrete Overlay. <br /> l in 'a <br /> a E P = Pavement Repair Area <br /> DConform Sto. 6+20 26'f - Shoulder Repair area <br /> j m See sheet No. 2 <br /> w M <br /> m NOTE: No Pavement Reinforcing Fabric from <br /> Sta. 48+00 to Sto. 63+00 (Lt.) and <br /> P Sto. 77+50 to Sto. 82+00 <br /> COUNTY OF SAN JOAQUIN I NO SCA PLAN ESCALON—BELLOTA ROAD RESURFACING Sheet No. <br /> (Mariposo Road to State Route Highway 4) 4 of 21 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APP 0 EC MENDED DTE <br /> �wx/r fir✓iri. s/a a..G1. �77or 6�t 7/olr0i4,4 � T <br />