My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2396 - SP2416
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2396 - SP2416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:00:34 AM
Creation date
1/23/2016 12:41:08 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Escalon-Bellota Road Resurfacing
Limits
Mariposa Road to State Route Highway 4
Year
2001
Project Engineer
Kaila Coppal
Roads Worked
Escalon-Bellota Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2396 - SP2416
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0.25' A.C. Overlay A 0.25' A.C. Overlay <br /> �+ <br /> Const. E.P. <br /> •• � <br /> to i III to (a N N (a <br /> X163 164 187 a W 188 <br /> io <br /> See sheet No.10 for W678 E.P.J �R d o a0 <br /> Box Culvert Extensions and pipe Details. R n Of <br /> y <br /> Place 6 L.F.x18" Dia. C.S.P. t `" <br /> with coupling band, refer to S.P. D97D R <br /> o <br /> W <br /> I % H <br /> 0 2' <br /> i U <br /> NI <br /> 2 <br /> D Conform 24'3 <br /> n <br /> 0 o vi QO 24'i Conform <br /> 0 0 lY I I I <br /> o n <br /> o w NOTE. No Pavement Reinforcing Fabric from <br /> Z Sta. 186+50 to Sta. 188+50 <br /> 0 0 1( 3 <br /> i <br /> - ( y U' <br /> 21 <br /> L Const. -te Z� <br /> See sheet No.11 for W676 ry,N R R E P <br /> Box Culvert Extensions and pipe Details. o <br /> PP <br /> 193 194 1 1 2114 245 1 246 <br /> n ; TP See sheet No.12 for W674 <br /> L T E.P.— Box Culvert Extensions and pipe Details. <br /> 0.25' A.C. Overlay ^ _ 0.25' A.C. Overlay <br /> COUNTY OF SAN JOAQU NNO SCALE PLAN ESCALON—BELLOTA ROAD RESURFACING Sheet No. <br /> (Moriposo Rood to State Route Highway 4) 6 of 21 <br /> DRAWN BY DATE PROJECT ENGINEER I DATE CHECKED DATE SUBMITTED `DATE APP OVAL MMENDED ATE <br /> &4 i7o7 Sn�o I • 'Y•f�i r gni <br />
The URL can be used to link to this page
Your browser does not support the video tag.