My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2423 - SP2430
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2423 - SP2430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:54:37 AM
Creation date
1/23/2016 12:41:51 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Fig Avenue and Peach Avenue Resurfacing
Limits
Airport Way to Union Road
Year
2001
Roads Worked
Fig Ave., Peach Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2423 - SP2430
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r EP Conform ® E.P. <br /> T <br /> 8' 1:1 <br /> PLANING ASPHALT CONCRETE PAVEMENT ASPHALT CONCRETE (TYPE B) <br /> i Conform 7 <br /> Location Quantity Location Quantity _ 12' Min. <br /> Existing Width <br /> Fia Avenue Mainline: <br /> Sta. 0+35 to Sta. 0+60 56 S.Y. Fig Avenue 0.30' Asphalt Concrete over shaped <br /> Sta. 52+18 to Sta. 52+43 155 S.Y. Sta. 0+35 to Sta. 52+43 1,935 Tons and compacted native material. <br /> Peach Avenue Peach Avenue TYPE D <br /> Sta. 0+35 to Stu. 0+60 56 S.Y. Sta. 0+35 to Sta. 52+44 1,941 Tons NOTES FOR TYPE D DRNEWAYS: <br /> Sta. 52+19 to Sta. 52+44 155 S.Y. Fia Avenue <br /> Intersections: Sta. 18+75 (Lt.) — Saw Cut and Remove Concrete <br /> Total 422 S.Y. Fig Avenue 144 Tons 16'3 from centerline of const. (Approx. 22 S.Y.) <br /> i <br /> Peach Avenue 144 Tons Sta. 31+75 (Lt.) — Saw Cut and Remove Concrete <br /> 18'3 from centerline of const. (Approx. 22 S.Y.) <br /> Mainline Widening: Peach Avenue <br /> Fig Avenue 259 Tons Sta. 43+20 (Rt.) — Saw Cut and Remove Concrete <br /> SHOULDER BACKING Peach Avenue 298 Tons 20'3 from centerline of const. (Approx. 22 S.Y.) <br /> nSta. 49+60 (Lt.) — Saw Cut and Remove Concrete <br /> Location Quantity 20'3 from centerline of const. (Approx. 22 S.Y.) <br /> m Fig Avenue 603 Tons �,�'. TOTAL 91 S.Y. <br /> > Peach Avenue 668 Tons Fig Avenue 138 Tons <br /> m Total 1 ,271 Tons Peach Avenue 168 Tons <br /> Project Totals: 5,027 Tons EP Conform ® E.P. <br /> R R <br /> DRIVEWAYS PLACE MONUMENT FRAMES & COVERS + <br /> Type D Type E Location Quantity Conform <br /> No. Area No. Area Fia Avenue <br /> Sta. 26+03 1 Each over existing paved driveway. <br /> Fig Avenue 14 387 S.Y. 17 532 S.Y. Peach Avenue <br /> Peach Avenue 17 595 S.Y. 15 428 S.Y. Sta. 26+03 1 Each * Peach Avenue: <br /> 10' Driveway at Sta. 47+17 Rt. <br /> o Total 31 982 S.Y. 32 960 S.Y. <— Total 2 Each 10' Driveway at Stu. 48+20 Rt. <br /> t. TYPE E <br /> m <br /> A R = Conform to existing radii <br /> TYPICAL DRIVEWAYS <br /> EOR'AWN <br /> NTY OF SAN JOAQUIN No SCALE SUMMARY OF QUANTITIES FIG AVENUE AND PEACH AVENUE RESURFACING <br /> Sheet No. <br /> BY DATE PROJECT ENGINEER I DATE T CHECKED DATE SUBMITTED DATE AP R VA ECOMMENDED PATE <br /> o1 1 14*,,1 04,ow l-& 11/4/0. � w/a <br />
The URL can be used to link to this page
Your browser does not support the video tag.