Laserfiche WebLink
r EP Conform ® E.P. <br /> T <br /> 8' 1:1 <br /> PLANING ASPHALT CONCRETE PAVEMENT ASPHALT CONCRETE (TYPE B) <br /> i Conform 7 <br /> Location Quantity Location Quantity _ 12' Min. <br /> Existing Width <br /> Fia Avenue Mainline: <br /> Sta. 0+35 to Sta. 0+60 56 S.Y. Fig Avenue 0.30' Asphalt Concrete over shaped <br /> Sta. 52+18 to Sta. 52+43 155 S.Y. Sta. 0+35 to Sta. 52+43 1,935 Tons and compacted native material. <br /> Peach Avenue Peach Avenue TYPE D <br /> Sta. 0+35 to Stu. 0+60 56 S.Y. Sta. 0+35 to Sta. 52+44 1,941 Tons NOTES FOR TYPE D DRNEWAYS: <br /> Sta. 52+19 to Sta. 52+44 155 S.Y. Fia Avenue <br /> Intersections: Sta. 18+75 (Lt.) — Saw Cut and Remove Concrete <br /> Total 422 S.Y. Fig Avenue 144 Tons 16'3 from centerline of const. (Approx. 22 S.Y.) <br /> i <br /> Peach Avenue 144 Tons Sta. 31+75 (Lt.) — Saw Cut and Remove Concrete <br /> 18'3 from centerline of const. (Approx. 22 S.Y.) <br /> Mainline Widening: Peach Avenue <br /> Fig Avenue 259 Tons Sta. 43+20 (Rt.) — Saw Cut and Remove Concrete <br /> SHOULDER BACKING Peach Avenue 298 Tons 20'3 from centerline of const. (Approx. 22 S.Y.) <br /> nSta. 49+60 (Lt.) — Saw Cut and Remove Concrete <br /> Location Quantity 20'3 from centerline of const. (Approx. 22 S.Y.) <br /> m Fig Avenue 603 Tons �,�'. TOTAL 91 S.Y. <br /> > Peach Avenue 668 Tons Fig Avenue 138 Tons <br /> m Total 1 ,271 Tons Peach Avenue 168 Tons <br /> Project Totals: 5,027 Tons EP Conform ® E.P. <br /> R R <br /> DRIVEWAYS PLACE MONUMENT FRAMES & COVERS + <br /> Type D Type E Location Quantity Conform <br /> No. Area No. Area Fia Avenue <br /> Sta. 26+03 1 Each over existing paved driveway. <br /> Fig Avenue 14 387 S.Y. 17 532 S.Y. Peach Avenue <br /> Peach Avenue 17 595 S.Y. 15 428 S.Y. Sta. 26+03 1 Each * Peach Avenue: <br /> 10' Driveway at Sta. 47+17 Rt. <br /> o Total 31 982 S.Y. 32 960 S.Y. <— Total 2 Each 10' Driveway at Stu. 48+20 Rt. <br /> t. TYPE E <br /> m <br /> A R = Conform to existing radii <br /> TYPICAL DRIVEWAYS <br /> EOR'AWN <br /> NTY OF SAN JOAQUIN No SCALE SUMMARY OF QUANTITIES FIG AVENUE AND PEACH AVENUE RESURFACING <br /> Sheet No. <br /> BY DATE PROJECT ENGINEER I DATE T CHECKED DATE SUBMITTED DATE AP R VA ECOMMENDED PATE <br /> o1 1 14*,,1 04,ow l-& 11/4/0. � w/a <br />