Laserfiche WebLink
0.25' 30' <br /> A.C. Overlay A.C. <br /> Trans. <br /> ■ <br /> 15 <br /> 0 <br /> 0 0 <br /> Const. <br /> I <br /> I I � <br /> R \ <br /> i d - <br /> o 0E n \ <br /> E.P. + I <br /> c c <br /> NORTH 99 FRONTAGE ROAD (WEST) 10 <br /> 13 12 11 v N <br /> z (n O+ — to <br /> a / <br /> m <br /> E.P. R o t o / <br /> LEGEND BEGINNING OF PROJECT <br /> ® Variable Depth Asphalt Concrete overlay. N 99 FRONTAGE RD . (W & E ) i <br /> I 1 <br /> ® 0.25' Asphalt Concrete Overlay I <br /> STATE ROUTE 99 <br /> over planed area (SR 99 Underpass) <br /> SOUTHBOUND <br /> 0.00 Depth of Asphalt Concrete Pavement Planing. <br /> o ■ Limits of Asphalt Concrete Pavement Planing. - � - WOODBRIDGE ROAD Sta. 10+00 (South) <br /> = WOODBRIDGE ROAD Sto. 100+00 (North) <br /> A <br /> m R Conform to Existing Radii. SPar <br /> A I <br /> —x---x— Existing Fence to remain in place <br /> m <br /> z Oleanders to remain in place <br /> o <br /> COUNTY OF SAN JOAQUIN NO SCALE PLAN N. 99 FRONTAGE ROAD W do E RESURFACING Sheet No. <br /> Yokelumne River to Woodbridge Rd. (W & E) & Woodbridge Rd. to kampo Rd. (W) a of 19 <br /> DRAWN BY DATE PROJECT ENGINEER DATE DATE SUBMITTED DATE APP A OMMENDED DAT <br />