Laserfiche WebLink
PAVEMENT REPAIR DRIVEWAYS PLACE MONUMENT <br /> Location QuantityType Quanti FRAME AND COVER <br /> No. Area Location Quantity <br /> 36 Locations 747 S.Y. D 15 705 S.Y. <br /> E 5 418 S.Y. Ste. 65+89 1 Each <br /> Ste. 79+05 1 Each <br /> PLANING ASPHALT ASPHALT CONCRETE Ste. 115+06 1 Each <br /> CONCRETE PAVEMENT Ste. 127+73 1 Each <br /> (TYPE B) Ste. 141 +06 , Each <br /> Location QuantityLocation Quantity Ste. 159+80 1 Each <br /> Ste. 185+12 1 Each <br /> Ste. 52+75 to Ste. 53+25 178 S.Y. Total 8 Each <br /> Ste. 190+50 to Ste. 191 +00 178 S.Y. Intersections 95 Tons <br /> Lammers Road Intersection 201 S.Y. Driveways 173 Tons <br /> Pavement Repair 299 Tons <br /> Total 557 S.Y. Total 567 Tons <br /> i <br /> a n <br /> ASPHALT CONCRETE <br /> EARTHWORK <br /> (TYPE A) <br /> Miscellaneous Areas <br /> a m <br /> Location Quantity Location Quantity <br /> Mainline <br /> 0 <br /> Sta. 160+50 to Sta. 167+50 7 Stations <br /> . Sugar Road Sta. 52+75 to Sta. 191+00 5,897 Tons <br /> Ste. 71 +20 to 71 +70 (Lt.) 0.5 Stations <br /> Total 6,897 Tons <br /> .. AA Total 7.5 Stations <br /> V` <br /> PAVEMENT REINFORCING <br /> ' SHOULDER BACKING FABRIC <br /> p Location Quantity <br /> 4 m Location Quantity 7 <br /> L Ste. 52+10 to Ste. 191 +00 5,384 Tons <br /> - Sta. 53+25 to Ste. 190+50 36,600 S.Y. <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUINNO Sca-E SUMMARY OF QUANTRIES TRAao BOULCityEEVARDmitst REESURFtti �AoCaIING sheet <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE S�UBMITTED DATE AP ROVAL WOMMENDED I D E <br /> tr s 9o./aw �S �y <br />