Laserfiche WebLink
ADJUST FRAME AND COVER SHOULDER BACKING ASPHALT CONCRETE (TYPE B) <br /> (Storm Drain Inlet) Location Quantity Location Quantity <br /> Location Quantity Harlan Road Intersections <br /> Stu. 23+97t (19' Rt.) 1 Each Sta. 10+37t to Sta. 106+20 886 Tons Hurd Road West 28 Tons <br /> Sta. 107+85 to Sta. 130+60 269 Tons Hospital Road West 35 Tons <br /> Lynn Avenue Pavement Repair 261 Tons <br /> Sta. 3+12f to Sta. 5+00 16 Tons Driveways (Type D) 64 Tons <br /> Total 1,171 Tons Driveways (Type E) 203 Tons <br /> Total 591 Tons <br /> PAVEMENT REPAIR <br /> Location Quantity DRIVEWAYS (TYPE D) <br /> 26 Locations (Throughout Project) 783 S.Y. Location Quantity <br /> 8 Locations 322 S.Y. <br /> Gus�ar <br /> /- / 712 <br /> a <br /> DRIVEWAYS (TYPE E) <br /> > PLANING ASPHALT CONCRETE PAVEMENT Location <br /> o Quantity <br /> T Location Quantity 37 Locations 2,105 S.Y. <br /> c m <br /> z Harlan Road <br /> 4sta. to+13f to sta. 10+87t a72 S.Y. PAVEMENT REINFORCING FABRIC <br /> o Sta. 105+90 to Sta. 106+20 80 S.Y. „ <br /> Stu. 107+85 to Sta. 108+05 53 S.Y. ASPHALT CONCRETE (TYPE A) Location Quantity <br /> n Sta. 130+40 to Stu. 130+60 53 S.Y. <br /> _ Location Quantity Harlan Road <br /> I Lvnn Avenue <br /> Sta. 3+12f to Sta. 3+62f133 S.Y. Sta. 11+00 to Sta. 95+60 (30' wide) 28,200 S.Y. <br /> Hurd Road Harlan Road Sta. 95+60 to Sta. 99+30 (24' wide) 987 S.Y. <br /> Sta. 10+37 to Sta. 106+20 7,334 Tons Sta. 99+30 to Sta. 105+90 (22' wide) 1,613 S.Y. <br /> Stu. 4+15f to Sta. 4+30t 40 S.Y. Sta. 107+85 to Sta. 130+60 1,012 Tons Sta. 108+05 to Sta. 130+40 (22' wide) 5,463 S.Y. <br /> Hospital Road Lynn Avenue Lynn Avenue <br /> w <br /> b Sta. 4+50t to Sta. 4+55t 47 S.Y. Sto. 3+12t to Sta. 5+00 137 Tons Sta. 3+40 to Sta. 4+85 (30' wide) 483 S.Y. <br /> 0 <br /> Total 878 S.Y. Total 8,483 Tons Total 36,746 S.Y. <br /> m <br /> �n <br /> z <br /> COUNTY OF SAN JOA UIN No SCALE SUMMARY OF QUANTITIES Hth Road <br /> ROAD RESURFACING sheet N9 <br /> Q Roth Road to French Cam Road s or 9 <br /> DRAWN BY I DATE I PROJECT ENGI EER DATE CH CKED DATE SUBMTTED D/ATE AP RECOMMENDED DOVE <br /> V,rced Li I Jonoi 144, ✓ ( '��/ <br />