Laserfiche WebLink
50' A.C. _ _ 0.25' A.0 Overlay_ <br /> N <br /> Trans. <br /> E } Nib rn <br /> r` C Const. <br /> of <br /> U o W a % <br /> N m 3 E.P. / <br /> rn <br /> 8077 78 ` 81 <br /> BEGINNING OF PROJETR E.P. <br /> Variable Depth Asphalt Concrete Overlay.Depth of Asphalt Concrete Pavement Ptaning. <br /> 3 22L Conform <br /> IQ m Asphalt Concrete Widening <br /> Asphalt Concrete Pavement Repair <br /> ■ Limits of Asphalt Concrete Pavement Planing. <br /> R Conform to Existing Radii. <br /> O Place Survey Monument Frame and Cover. <br /> Refer to S.J. Co. Improvement Standards <br /> No. CW—M1 . See Sheet No. 5 for detail <br /> and Sheet No. 6 for locations. <br /> (o; Adjust Survey Monument Frame and Cover. <br /> f ® Water/Gas Valve to be adjusted by others <br /> p �3 Maintenance Hole (To be adjusted to grade) <br /> Z:,' Exist. Fire Hydrant <br /> z <br /> 0 — Direction of Surface Drainage <br /> r-COUNTY OF SAN JOA UIN NO SCALE PLAN LAMMERS ROAD RESURFACING Sheet No. <br /> Q (Valpico Rood to Schulte Road) 3 of 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVA R MENDED DATE <br /> fib,:f«s.�lary 7/0+ Y/ 0 7101 A4 /9, <br />