Laserfiche WebLink
PAVEMENT REPAIR DRIVEWAYS PAVEMENT REINFORCING <br /> 37 Locations 1 ,059 S.Y. Type Quantity FABRIC <br /> No. :57S. <br /> Location Quantity <br /> D 2 Y. Sto. 76+00 to Sta. 90+30 3,233 S.Y. <br /> E 7 2S.Y. Sta. 90+52 to Sto. 109+80 4,284 S.Y. <br /> PLANING ASPHALT 7,517 S.Y. <br /> CONCRETE PAVEMENT <br /> Location Quantity <br /> Schulte Rood (West) 122 S.Y. ASPHALT CONCRETE PLACE SURVEY MONUMENT <br /> End of Project 96 S.Y. (TYPE A) FRAME AND COVER <br /> Total 220 S.Y. <br /> Location Quantity Location Quantity <br /> Mainline 1 ,348 Tons Stc. 91 +18.82 1 Each <br /> Widening 79 Tons <br /> m <br /> I� ^' Total 1427 Tons <br /> ADJUST SURVEY MONUMENT <br /> FRAME AND COVER <br /> Location Quantity EARTHWORK (ROADWAY WIDENING) <br /> Sto. 77+00 1 Each ASPHALT CONCRETE <br /> Sto. 75+75 to Sta. 90+00 14.25 Stations <br /> (TYPE B) <br /> SHOULDER BACKING Location Quantity <br /> 7 <br /> Location Quantity Intersections 121 Tons <br /> o Driveways 39 Tons <br /> Sto. 75+00 to Sto. 113+00 1082 Tons Pavement Repair 424 Tons <br /> m Side Streets 120 Tons <br /> r <br /> Total 1202 Tons Total 584 Tons <br /> z <br /> n <br /> COUNTY OF SAN JOAQUIN No sc&E SUMMARY OF QUANTITIES LAMMERS ROAD RESURFACING Sheet No. <br /> (Valpico Road to Schulte Road) 6 of 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED 4 1 DATE SUBMITTED DATE APPRO AL ECOMMENDED DATE <br /> 1°,.N.eru.�•!aa 7/a� '�ro •� 7 /d dl 7�4 �rJ �/•0�2 i ��le <br />