Laserfiche WebLink
CLEANING EXISTING SHOULDER BACKING PLACE ASPHALT CONCRETE DIKE <br /> DRAINAGE FACILITIES Location Type Length <br /> Location Quantity Ste. 86+31 to Ste. 86+90 Lt. C 59 L.F. <br /> Location Quantity LEFT SHOULDER Ste. 86+31 to Ste. 86+84 Rt. C 53 L.F. <br /> Ste. 87+70 (Rt.) Lump SumSta. 91 +94 to Sta. 142+50 Ste. 87+11 to Ste. 87+21 Rt. A 10 L.F. <br /> Sta. 87+66 to Sta. 88+12 Lt. A 46 L.F. <br /> Sta. 154+50 to Sta. 198+00 <br /> RIGHT SHOULDER 2,316 Tons Stu. 87+73 to Sto. 87+85 Rt. A 12 L.F. <br /> Stu. 90+71 to Ste. 91 +94 Lt. A 123 L.F. <br /> Ste. 87+85 to Ste. 142+50 <br /> Ste. 154+50 to Ste. 198+00 Total 303 L.F. <br /> m <br /> A <br /> O <br /> PAVEMENT REPAIR QRIVEWAYS (TYPE D) PAVEMENT REINFORCING FABRIC <br /> o. <br /> Location Quantity <br /> $ Location Quantity Quantity Area Ste. 86+16 to Ste. 142+50 13,772 S.Y. <br /> o (22' Wide) <br /> f T Throughout Project (29 locations) 711 S.Y. 4 Locations 147 S.Y. Ste. 154+50 to Sta. 198+00 10,633 S.Y. <br /> o m (22' Wide) <br /> — z <br /> Total 24,405 S.Y. <br /> M <br /> DRIVEWAYS (TYPE E) <br /> Quantity Area PLACE MONUMENT FRAME & COVER <br /> 6 Locations 265 S.Y. Location Quantity <br /> PLANING Ste. 133+49+ 1 Each <br /> ASPHALT CONCRETE PAVEMENT Ste. 125+79f 1 Each <br /> ASPHALT CONCRETE Total 2 Each <br /> QN Location Quantity (TYPE A) <br /> Ste. 86+16 to Ste. 86+36 71 S.Y. Location Quantity <br /> Ste. 142+00 to Ste. 142+50 134 S.Y. Mainline 4,507 Tons A.C. (MISC. AREAS) <br /> 67 iTons <br /> Repair 1 <br /> Sta. 154+00 to Sta. 154+50 134 S.Y. PavementLocation Quantity <br /> p Sta. 197+50 to Sta. 198+00 134 S.Y. Driveways 64 TonsA,C. Overside Drains (2 Locations) 3 Tons Sta. 86+40+ A.C. Overside Drain 8 S.Y. <br /> fA.C. Dike (Types A & C) 6 Tons Ste. 91 +30f A.C. Overside Drain 8 S.Y. <br /> Ill Mx Total 473 S.Y. Total 4,747 Tons Total 16 S.Y. <br /> m <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES AIRPORT WAY Sheet <br /> (San Joaquin River to Mortensen Road) 6 of 6 6 <br /> DRAWN BY DATE I PROJECT ENGINEER DATE ClJECVEZL, DATE SUBMITTED DATE APPROVAL RECOMMENDED DAAT/E <br /> f�raen�avr� 10/01 �.L 1..� �'i/e� 3AI l°(7li1 �/1� /J- ��4, 7J/61Y41� .✓ 1670/ <br />