My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2507 - SP2513
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2507 - SP2513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:00:36 AM
Creation date
1/23/2016 12:43:41 AM
Metadata
Fields
Template:
Small Plans - SP
Project
East Stockton Streets Resurfacing Phase 2
Limits
Walker Lane, Miller Avenue, Dana Avenue, Elvin Avenue & Weber Avenue
Year
2001
Project Engineer
Kaila Coppal
Roads Worked
Walker Ln., Miller Ave., Dana Ave., Elvin Ave.
Weber Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2507 - SP2513
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Limits of Clearing and Grubbing <br /> and Mailbox Relocation. <br /> 2 -4 12' 12. 2._4. <br /> See See <br /> Shoulder Shoulder <br /> GENERAL NOTES: 22• Pavement Reinfaraing Schedule Fabric Conform Schedule Conform <br /> w. <br /> 1 . Placement of asphalt concrete shall not begin <br /> until the asphalt concrete used in Pavement <br /> m <br /> Repair has been in place for 24 hours. --- - ''"` _ _ _ - —. -- - <br /> 2. Frame and Cover for maintenance holes shall be Existing Road way <br /> adjusted to Finished Grade. Refer to Improvement 0.21 ' A.C. Overlay <br /> Std. No. CW—R36 for details. TYPICAL SECTION <br /> nWalker Avenue: Sta. 10+52 to Sta. 20+85o 3. Existing drainage facilities are to remain in place. Miller Avenue: Sta. 10+10 to Sta. 21+10 <br /> H The contractor shall conduct his work as not to <br /> m ti modify or obstruct the existing drainage, unless Dana Avenue: Sta. 22+00 to Sta. 32+85 Elvin Avenue: Ste. 21+80 to Sta. 32+85 <br /> o n otherwise shown on the plans. Weber Avenue: Sta. 21+80 to Ste. 32+85 <br /> 4. Water/gas valve frames and covers to be adjusted <br /> by others after completion of project. <br /> 0 <br /> 0 5. Shoulder Backing material at all radii shall be blended <br /> o with the top 6" of native material as directed by the Engineer. SHOULDER SCHEDULE <br /> Limits of this work shall be confined to intersection radii plus <br /> 50' each direction. Payment for blending shall be considered as WALKER AVENUE <br /> included in the unit price paid for Shoulder Backing. <br /> Station: Left Right <br /> 6. Asphalt Concrete shall be placed in two layers of approximately Sta. 1D+52 to sm. 20+85 a' 4' <br /> equal thickness with Pavement Reinforcing Fabric on existing <br /> or prepared surface. MILLER AVENUE <br /> 7. Payment for removal and disposal of drainage pipes where Sto. 10+10 to Sta. 14+00 3' 2' <br /> indicated in the plans shall be considered as included Sta. 14+00 to Sta. 21+10 2' 1 2' <br /> in the contract Lump Sum unit price for Clearing and Grubbing. DANA AVENUE <br /> 8. Removal of A.C. Dikes where shown on the plans shall be done Sta. 22+00 to Sta. 32+85 <br /> in such manner as not to damage surface beneath dike. ELVIN AVENUE <br /> Payment for Dike removal shall be considered as included Ste. 21+80 to Ste. 28+00 2' 2' <br /> o , in the contract Lump Sum unit price for Clearing and Grubbing. <br /> Y Sta. 28+00 to Sta. 32+85 3' 2' <br /> Nn 9. Place Monument Frame and Cover. Refer to S.J. Co. Improvements <br /> A Standards CW-M1 and sheet 7 for locations. WEBER AVENUE <br /> � � 10. Removal of Tree Stump (Sta. 16+55t Rt. Walker Ln.) shall be Sta. 21+80 to Sta. 28+00 2' 3' <br /> �J m considered as included in the contract Lump Sum unit price for sta. 28+00 to Sto. 32+85 2' 2' <br /> f o Clearing and Grubbing. <br /> COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION EAST STOCKTON STREETS RESURFACING PHASE 2 Sheet No. <br /> AND GENERAL NOTES Walker Lane Miller Ave. Dana Ave. Elvin ave. & Weber Ave. 2 of 7 <br /> DRAWN BY DATE PROJECT ENGINEER <br /> DATE D DATE SUBMITTED GATE APPROVAL RECOMMENDED DATE <br /> �weigae �rGia 6/2001 ,, ,.A A/xs�i �•lirl.i r <br />
The URL can be used to link to this page
Your browser does not support the video tag.