My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2514 - SP2520
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2514 - SP2520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:01:00 AM
Creation date
1/23/2016 12:43:53 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Stewart Street Resurfacing
Limits
Sanguinetti Lane to Filbert Street
Year
2001
Project Engineer
Kaila Coppal
Roads Worked
Stewart St.
Red Lines
No
Supplemental fields
Cross Ref
SP2514 - SP2520
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0.21 ' A.C. Overlay 0.21 ' A.C. Overlay25 A�C.��0.10' A.C. OverIS�A.C. Trans. 0.21' A.G. <br /> (Over Widening and Leveling) Trans. I Overlay <br /> Conform0.10 2a t I Sta. 6+47 <br /> Exist. Curb & Gutter to <br /> ■ remain in place (Typ.). c,l 0.10' A.C. Overlay <br /> 10'— S (Over Planed A.C.) <br /> v <br /> - - _ 0.08' - <br /> Const. 18"0 Almond tr e <br /> -0 0.00' (to be removed <br /> c �iF <br /> C6 '� <br /> N N / . —JP (to be relocated) ® c <br /> E.P. dt + / / (by others) Vo <br /> o 83 <br /> n <br /> U O N <br /> • • � ' � W ern / Roadway Widening vo wn `C.C.T.Co. Railroad <br /> 84 -- - - _ _ m to be considered -o n m p (Crossing No. 61-1.9) <br /> X3.8' and paid for as 3 m o R <br /> o Conform to concrete <br /> Pavement Repair. w v1 qG0 planking or 2' from roil. <br /> R (See Note below) <br /> I <br /> .0.00 <br /> m �. Exist. Curb & Gutter to85 o O <br /> % remain in place (Typ.). E.P. <br /> o moo.p8. ,� 86 8 •� � m _ <br /> 10' � '@ o' 0 88 <br /> rt <br /> j Clo I R R o <br /> ® <br /> rt o �8' a�+ <br /> f cls mo ' / h t00 <br /> o <br /> + 6 m <br /> O/ U3 m W N Of O I(n <br /> W m <br /> ROADWAY WIDENING SCHEDULE Leveling Course <br /> (Refer to Detail Sht. 2) �- - 0.10' A.C. Overlay <br /> o (Over Planed A.C.) <br /> Const. Rdwy. Widening Rdwy. Widening <br /> Station (Left Side) to New E.P. (Right Side) <br /> v, 85+72 3.8'± 23.1 '+ 8.0'± 0.Conform 10' 23't Ste. 4+00 <br /> 0 <br /> 86+00 9.7'± 20.7'+ 1 .0'+ o <br /> 86+50 5.3'± 16.3'± <br /> T 87+00 1 .0'± 120'+ rn <br /> Note: Central California Traction Co.: <br /> o placed ProposedConcrete <br /> CRailroad crews nprioor to <br /> roadway resurfacing. <br /> COUNTY OF SAN JOAQUIN No SCALE PLAN STEWART STREET RESURFACING sheet No. <br /> (Sanguinetti Lane to Filbert Street) 4 of 7 <br /> DRAWN BY DATE PROJECT ENGINEER DATE Cy DATE SUBMITTED DATE APPROVAL RECOMMENDED DATE <br /> *++r14delG 11/2001 <br /> //�/ IIT/01 //�(/➢x� ��yo %/rafryGefi � fl�Z /!/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.