My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2531 - SP2542
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2531 - SP2542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:01:59 AM
Creation date
1/23/2016 12:44:13 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Harding Way Improvements
Limits
Filbert Street to Report Avenue
Year
2001
Project Engineer
Jeffrey Levers
Roads Worked
Harding Wy.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2531 - SP2542
Type
Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLEAN EXISTING ADJUST MANHOLE SHOULDER BACKING <br /> HIGHWAY FACILITIES FRAME AND COVER <br /> Location Quantity Location Quantity Location - Quantity <br /> y Sta. 3+22 (Storm) 1 Each Rt. <br /> Sta. 9+38 30'f (Rt.) 1 Lump Sum Sta. 3+33 (Rt.), (Sanitary) 1 Each St147 tSta. 1 +61 to Sta. 15+98u. + o Sta. 8+45 ) 123 Tons <br /> 60 Tons <br /> Sta. 7+19 (Rt.), (Sanitary) 1 Each ((Lt.) <br /> Sta. 10+21 (Rt.), (Sanitary) 1 Each <br /> Sta. 16+26 to Sta. 23+78 Rt. 64 Tons <br /> Sta. 13+25 (Lt.), (Sanitary) 1 Each Sta. 16+26 to Sta. 23+78 (Lt.) 64 Tons <br /> Sta. 18+72 (Rt.), (Sanitary) 1 Each Intersections 20 Tons <br /> Stu. 21+34 (Sanitary) 1 Each Total 331 Tons <br /> Total 7 Each <br /> PAVEMENT REPAIR <br /> EARTHWORK <br /> Location ation cations Throughout Project Quantity <br /> 0 S.Y.S (MISC. AREAS) _ <br /> Location Quantity DRIVEWAYS <br /> m <br /> a <br /> Sta. 7+36 to Sta. 15+36 8.0 Sta. Type Number Area <br /> �. <br /> Sta. 18+00 to Sta. 23+38 5.8 Sta. Type D 17 Locations 392 S.Y. <br /> a Total 13.8 Sta. <br /> > Type E 6 Locations 203 S.Y. <br /> o PLANING ASPHALT <br /> CONCRETE PAVEMENT EARTHWORK <br /> Location Quantity (ROADWAY WIDENING) <br /> Sta. 0+97 to sta. 1+62 250 S.Y. Location Quantity ASPHALT CONCRETE - <br /> Sta. 3+22 Newport Avenue (Lt.) 62 S.Y. <br /> Sta. 3+22 Newport Avenue (Rt.) 72 S.Y. Stu. 1+61 to Sta. 2+75 (Rt.) 1.1 Sta. (TYPE B) <br /> Sta. 7+17 Rhode Island Avenue (Lt.) 33 S.Y. Sta. 1+47 to Stu. 2+96 (Lt.) 1 .5 Sta. Location Quantity <br /> Sta. 7+17 Rhode Island Avenue (Rt.) 33 S.Y. Sta. 3+51 to Stu. 6+94 (Lt.) 3.4 Sta. <br /> Stu. 9+13 to Sta. 15+75 (Lt.) 441 S.Y. Sto. 3+73 to Stu. 6+88 (Rt.) 3.2 Sta. Mainline 1106 Tons <br /> 9 <br /> o Sta. 15+72 to Stu. 15+97 250 S.Y. Sta. 7+36 to Stu. 8+45 (Lt.) 1 .1 Sta. Intersections 116 Tons <br /> E Sta. 16+26 to Stu. 16+51 151 S.Y. Stu. 7+36 to Sto. 15+36 (Rt.) 8.0 Sta. Driveways 12 Tons <br /> z Sto. 18+67 Chronicle Avenue (Lt.) 33 S.Y. Sta. 16+54 to Sta. 18+50 (Lt.) 2.0 Sto. Widening 358 Tons <br /> �+ Stu. 21+32 Sutro Avenue (Lt.) 33 S.Y. Sta. 18+85 to Sta. 21+14 (Lt.) 2.3 Stu. Pavement Repair 77 Tons <br /> Fn Stu. 23+53 to Sta. 23+78 86 S.Y. Sta. 21+55 to Sta. 23+78 (Lt.) 2.2 Sta. Misc. Areas 50 Tons <br /> Total 1,444 S.Y. Total 24.8 Sta. Total 1,719 Tons <br /> COUNTY OF SAN JOAQUIN No SCALE SUMMARY OF QUANTITIES HARDIIN stree WAYIMPROVEMENTSMPROVEort AMEN�S Shee11 t Not. <br /> DRAWN BY DATE I PROJECT ENGINEER I DATE L CHECKED I DATE 1 SUBMnTED DATE I APPROVAL RECOMMENDEDDATE <br /> T.M.Levers 7/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.