Laserfiche WebLink
CLEAN EXISTING ADJUST MANHOLE SHOULDER BACKING <br /> HIGHWAY FACILITIES FRAME AND COVER <br /> Location Quantity Location Quantity Location - Quantity <br /> y Sta. 3+22 (Storm) 1 Each Rt. <br /> Sta. 9+38 30'f (Rt.) 1 Lump Sum Sta. 3+33 (Rt.), (Sanitary) 1 Each St147 tSta. 1 +61 to Sta. 15+98u. + o Sta. 8+45 ) 123 Tons <br /> 60 Tons <br /> Sta. 7+19 (Rt.), (Sanitary) 1 Each ((Lt.) <br /> Sta. 10+21 (Rt.), (Sanitary) 1 Each <br /> Sta. 16+26 to Sta. 23+78 Rt. 64 Tons <br /> Sta. 13+25 (Lt.), (Sanitary) 1 Each Sta. 16+26 to Sta. 23+78 (Lt.) 64 Tons <br /> Sta. 18+72 (Rt.), (Sanitary) 1 Each Intersections 20 Tons <br /> Stu. 21+34 (Sanitary) 1 Each Total 331 Tons <br /> Total 7 Each <br /> PAVEMENT REPAIR <br /> EARTHWORK <br /> Location ation cations Throughout Project Quantity <br /> 0 S.Y.S (MISC. AREAS) _ <br /> Location Quantity DRIVEWAYS <br /> m <br /> a <br /> Sta. 7+36 to Sta. 15+36 8.0 Sta. Type Number Area <br /> �. <br /> Sta. 18+00 to Sta. 23+38 5.8 Sta. Type D 17 Locations 392 S.Y. <br /> a Total 13.8 Sta. <br /> > Type E 6 Locations 203 S.Y. <br /> o PLANING ASPHALT <br /> CONCRETE PAVEMENT EARTHWORK <br /> Location Quantity (ROADWAY WIDENING) <br /> Sta. 0+97 to sta. 1+62 250 S.Y. Location Quantity ASPHALT CONCRETE - <br /> Sta. 3+22 Newport Avenue (Lt.) 62 S.Y. <br /> Sta. 3+22 Newport Avenue (Rt.) 72 S.Y. Stu. 1+61 to Sta. 2+75 (Rt.) 1.1 Sta. (TYPE B) <br /> Sta. 7+17 Rhode Island Avenue (Lt.) 33 S.Y. Sta. 1+47 to Stu. 2+96 (Lt.) 1 .5 Sta. Location Quantity <br /> Sta. 7+17 Rhode Island Avenue (Rt.) 33 S.Y. Sta. 3+51 to Stu. 6+94 (Lt.) 3.4 Sta. <br /> Stu. 9+13 to Sta. 15+75 (Lt.) 441 S.Y. Sto. 3+73 to Stu. 6+88 (Rt.) 3.2 Sta. Mainline 1106 Tons <br /> 9 <br /> o Sta. 15+72 to Stu. 15+97 250 S.Y. Sta. 7+36 to Stu. 8+45 (Lt.) 1 .1 Sta. Intersections 116 Tons <br /> E Sta. 16+26 to Stu. 16+51 151 S.Y. Stu. 7+36 to Sto. 15+36 (Rt.) 8.0 Sta. Driveways 12 Tons <br /> z Sto. 18+67 Chronicle Avenue (Lt.) 33 S.Y. Sta. 16+54 to Sta. 18+50 (Lt.) 2.0 Sto. Widening 358 Tons <br /> �+ Stu. 21+32 Sutro Avenue (Lt.) 33 S.Y. Sta. 18+85 to Sta. 21+14 (Lt.) 2.3 Stu. Pavement Repair 77 Tons <br /> Fn Stu. 23+53 to Sta. 23+78 86 S.Y. Sta. 21+55 to Sta. 23+78 (Lt.) 2.2 Sta. Misc. Areas 50 Tons <br /> Total 1,444 S.Y. Total 24.8 Sta. Total 1,719 Tons <br /> COUNTY OF SAN JOAQUIN No SCALE SUMMARY OF QUANTITIES HARDIIN stree WAYIMPROVEMENTSMPROVEort AMEN�S Shee11 t Not. <br /> DRAWN BY DATE I PROJECT ENGINEER I DATE L CHECKED I DATE 1 SUBMnTED DATE I APPROVAL RECOMMENDEDDATE <br /> T.M.Levers 7/01 <br />