Laserfiche WebLink
JY <br /> 50' A.C. 0.25' A.C. Overlay 217'± A.C. <br /> Transition Transition <br /> 0.50' Pavement Repair p <br /> E E a <br /> 0 0 <br /> O 0 <br /> + +:'.. + + <br /> m + + Conform to Existing E <br /> oConcrete Planking a 'o a S <br /> Place MBGR <br /> See Sheet 6 <br /> for Railing Details 10' <br /> m J' ,• EP <br /> '.. R.R. Xing Signal Yo <br /> o a remain in place Typ.) <br /> .... <br /> a — s _ — — — — —2888 <br /> — — —� 0.09 289 — — 290 291 <br /> 4' - Conform <br /> N � EP <br /> 1�0. \Q1 <br /> God � i .• � � f <br /> w Ca°`arm END OF PROJECT <br /> R(PD <br /> Q'� N <br /> Con orm <br /> F <br /> A <br /> m <br /> O <br /> COUNTY OF SAN JOAQUINNO SCALECONSTRUCTION DETAILS BIRD ROAD RESURFACING Sheet No. <br /> (500'± N/O Durham Ferry Road to Ahern Road) 5 of 8 <br /> I DRAWN ZBY DATE I PROJECT ENGINEER I DATE C_ CKED DATE SUBMITTED DAT <br /> BMITTED E APPROVAL RECOMMENDED DATE <br /> CnMlI�M6 Jt�un 12/01 / /2/,vA, Imay/WMl / /B N2I& J 121,10/ <br />