My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2552 - SP2559
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2552 - SP2559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:03:01 AM
Creation date
1/23/2016 12:44:43 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Bird Road Resurfacing
Limits
500+/- N/O Durham Ferry Road to Ahern Road
Year
2001
Project Engineer
Kaila Coppal
Roads Worked
Bird Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2552 - SP2559
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR ADJUST SURVEY MONUMENT ASPHALT CONCRETE (TYPE B) <br /> Location Quantity FRAME AND COVER Location Quantity <br /> 84 LOCATIONS 1998 S.V. Location Quantity Intersection 99 Tons <br /> Sta. 227+091 1 Each Driveways 127 Tons <br /> Sta. 279+901 1 Each Pavement Repair 666 Tons <br /> CLEANING EXISTING Total 2 Each Total 892 Tons <br /> DRAINAGE FACILITIES PAVEMENT REINFORCING FABRIC <br /> Location Quantity SHOULDER BACKING Location Quantity <br /> Sta. 278+653 L.S Location Quantity <br /> Sta. 179+00 to Sta. 228+03 10,896 S.Y. <br /> m Sta. 178+50 to Sta. 290+00 1,362 Tons Sta. 277+95 to Sta. 285+26 1,625 S.Y. <br /> v Sta. 287+12 to Sta. 289+50 529 S.Y. <br /> End of Project to Conform 535 S.Y. <br /> PLANING ASPHALT Total 13,565 S.Y. <br /> CONCRETE PAVEMENT DRIVEWAYS <br /> g Location QuantityType No. Quant PLACE SURVEY MONUMENT <br /> o T Sta. 178+50 to Sta. 179+00 122 S.Y. D 7 z26 S.Y. FRAME AND COVER <br /> Sta. 228+03 to Sta. 228+53 122 S.Y. <br /> E 20 717 S.Y. Location Quantity <br /> o z <br /> Sta. 228+53 to Sta. 278+45 122 S.Y. <br /> c Sta. 278+45 to Sta. 277+95 12,203 S.Y. Stu. 200+493 1 Each <br /> Sta. 279+903 (Int. Crone Road) 40 S.Y. EARTHWORK <br /> Sta. 285+473 (South RR Approach) 24 S.Y. <br /> 3 Sta. 287+12 to Sta. 289+00 (4' wide) 83 S.Y. MISCELLANEOUS AREAS METAL BEAM GUARD RAIL <br /> Stu. 289+00 to Sta. 291+17 155 S.Y. Location Quantity Location Quantity <br /> Sta. 287+25 to Sta. 288+00 75 L.F. <br /> Total 12,871 S.Y. Sta. 178+50 to Stu. 291+17 112 Stations <br /> I TERMINAL SECTION TYPE A <br /> f N IMPORTED BORROW ASPHALT CONCRETE (TYPE A) Location Quantity <br /> o Location Quantity Location Quantity <br /> Sta. 287+243 1 Each <br /> � Sta. 268+013 1 Each <br /> n Sta. 287+24 to Sta. 288+32 15.52 C.Y. Mainline 3,581 Tons Total 2 Each <br /> N � <br /> z <br /> 0 <br /> COUNTY OF SAN JOA VI NO SCAB (500'3 8 SUMMARY OF QUANTITIES BIRD ROAD RESURFACING Sheet <br /> Q N/0 Durham Ferry Rood to Ahern Road) 8 of 8 <br /> DRAWN BY DATE I PROJECT ENGINEER I DATE DATE SUB D DATE APPROVAL RECO MENDED DATE <br /> &-ij 9d6a- 12/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.