My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2579 - SP2584
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2579 - SP2584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:04:25 AM
Creation date
1/23/2016 12:45:19 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Waudman Avenue Resurfacing
Limits
Don Avenue to 900' W/O Alpha Drive
Year
2002
Project Engineer
Kaila Coppal
Roads Worked
Waudman Ave.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2579 - SP2584
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR PLANING ASPHALT ASPHALT CONCRETE (TYPE B) <br /> Location Quantity CONCRETE PAVEMENT Location Quantity <br /> 19 LOCATIONS 388 S.Y. Location Quantity <br /> Mainline 413 Tons <br /> Sta. 0+39 to Sta. 0+59 (Beg. of Project) 110 S.Y. Intersection 62 Tons <br /> Sta. 0+39 to Sto. 12+22 (Along Gutter) 606 S.Y. Driveways 50 Tons <br /> Int. Golden Bear (West) Transition & Pavement Repair 122 Tons <br /> curb returns. 124 S.Y. Leveling <br /> Int. Golden Bear (East) Transition & Sta. 6+10 to Sta. 7+00 9 Tons <br /> ADJUST SURVEY MONUMENT <br /> curb returns. 124 S.Y. Sta. 7+50 to Sta. 9+10 22 Tons <br /> FRAME AND COVER Int. Agate Court, Transition & Sta. 10+30 to Sta. 12+84 56 Tons <br /> curb returns. 109 S.Y. Total 734 Tons <br /> Location Quantity Sta.12+34 to Sta.12+84 (End of Project) 40 S.Y. <br /> m <br /> Sta. 4+293 ( 28' Rt.) Golden Bear West 1 Each Toes 1,113 S.Y. <br /> Sto. 6+553 ( 28' Rt.) Golden Bear East 1 Each <br /> Sto. 10+953 (2' Lt.) 1 Each REINFORCING FABRIC <br /> o Total 3 Each Location Quantity <br /> `3 pps <br /> 6 <br /> Sta. 0+59 to Sta. 12+69 2,958 SY <br /> a � <br /> 0 <br /> SHOULDER BACKING <br /> o Location Quantity <br /> ADJUST MAINTENANCE HOLE Sta. 0+39 to Sta. 12+84 139 Tons <br /> FRAME AND COVER <br /> 3 Location Quantity <br /> Sta. 4+233 ( 6' Lt.) 1 Each <br /> Sta. 4+343 ( 3' Rt.) 1 Each <br /> Sta. 6+523 ( 6' Lt.) 1 Each DRIVEWAYS <br /> Sta. 6+613 ( 3' Rt.) 1 Each <br /> ' Sta. 10+933 ( 9' Lt.) 1 Each Type Quantity <br /> o ` 0 <br /> Sta. 11+063 ( 3' Rt.) 1 Each No. I Area <br /> (~/ f Total 6 Each D 8 149 S.Y. <br /> ' n p E 11 234 S.Y. <br /> z <br /> 0 <br /> COUNTY OF SAN JOA UIN NO SCALE SUMMARY OF QUANTITIES WAUDMAN AVENUE RESURFACING Sheet No. <br /> Q Don Avenue to 900 w/o Alpha Drive 6 of B <br /> 77 <br /> DRAWN BY DATE I PROJECT nENGINEER DATE CHECXECL DATE �y/� � SUBM D DATE APPROVAL RECO MENDED DATE <br /> 1/02 f ak.. C r�.z. r�pro 1146 •AL!fI ��iai 7�el.a/v <br />
The URL can be used to link to this page
Your browser does not support the video tag.