My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2607 - SP2616
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2607 - SP2616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:07:17 AM
Creation date
1/23/2016 12:45:54 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Austin Road Resurfacing
Limits
French Camp Road to Mariposa Road
Year
2002
Project Engineer
Ponch Trevino
Roads Worked
Austin Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2607 - SP2616
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> I <br /> Limits of Clearing and Grubbing, and mailbox relocation <br /> 1' 4' 4' 12' 12' 4' 4' 1' <br /> 22' Pavement Reinforcing Fabric <br /> Conform I Conform <br /> Var. Var. gy, <br /> �V, <br /> z 'A _ _ _ <br /> N * L 9 Y <br /> Shoulder Backing Existin Roadway <br /> 0.25' Asphalt Concrete <br /> MD.) 0.12' Asphalt Concrete (Sto. 430+05 to Sta. 431 +05) <br /> g TYPICAL SECTION <br /> o m Sta. 205+96 to Sta. 447+75 <br /> 0 Z <br /> N � <br /> Z <br /> Z <br /> S GENERAL NOTES <br /> Z <br /> 1. All earthwork (except for final grading of the shoulders S. Pavement Reinforcing Fabric shall be placed between <br /> and placement of shoulder backing material) shall the first layer and the existing prepared surface. <br /> be completed prior to placing finished course of <br /> asphalt concrete. <br /> 6. At the option of the Contractor, the grinding materials <br /> from various items of work may be deposited in the <br /> 2. Asphalt Concrete used for Pavement Repair shall not Shoulder Backing areas, except in the sod/lawn frontage. <br /> be placed in layers which exceed 0.50' in compacted <br /> r w thickness. <br /> 7. Shoulder Backing Material (Top Soil) shall be placed <br /> 3. Placement of Asphalt Concrete Surfacing shall not begin in shoulder areas with existing sod/lawn frontage from <br /> In until Asphalt Concrete used for Pavement Repair has Sta. 307+60 to Sta. 321 +90 (Lt.) Payment for <br /> been in place for a minimum of 18 hours. placement of approximately 120 tons of (Top Soil) <br /> o shall be considered under the Shoulder Backing <br /> > Item of work. <br /> f 4. Where superelevations exist on horizontal curves the <br /> new surface slope and drainage shall conform to existing. <br /> � 8. Prior to Asphalt and Shoulder operations, the contractor <br /> mis to place Temporary Silt Fence in those areas indicated <br /> z on the Summary of Quantities. <br /> Z <br /> COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION AND GENERAL NOTES (FeShINarRORDaR EoSMoRF�CaINR ad) et No. <br /> 2eof 10 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHE KED �DATE SUBMITTED DATE �APPROVAL RECOMMENDED /DATE <br /> Jews.STi`ww Z/i�/•: 1%-A rwr. 4�N/�t - O /�/•z OZ �'z/A!/O� 31j 8162 <br />
The URL can be used to link to this page
Your browser does not support the video tag.