My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2617 - SP2626
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2617 - SP2626
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:07:44 AM
Creation date
1/23/2016 12:46:05 AM
Metadata
Fields
Template:
Small Plans - SP
Project
New Hope Road and Sacramento Boulevard Resurfacing
Limits
Town of Thornton
Year
2002
Project Engineer
Ponch Trevino
Roads Worked
New Hope Rd., Sacramento Blvd.
Red Lines
No
Supplemental fields
Cross Ref
SP2617 - SP2626
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Show annotations
View images
View plain text
Const. Const. <br /> _ Limits of Clearing and Grubbing Limits of Clearing and Grubbing <br /> FAand MailboxJ <br /> 18 <br /> 2' 4' 12' 12' 4' 2' � � 1 <br /> � 11 ' Pavement Place A.C. Dike <br /> (Type A) <br /> 1' 22' Pavement enforcing Fabric 1 ' <br /> Reinforcing Fabric <br /> El F 1 Val. <br /> 8% Var. Vacs 8% <br /> �Or. �_ V°\` <br /> ✓. _ <br /> .°� Conform 1 __________ ______ _____________ _____�' Conform 0.21' Asphalt Concrete <br /> m `ng t <br /> a Shoulder Backing Existing Roadway 1 or <br /> Backing <br /> ° 0.21 ' Asphalt Concrete NEW HOPE ROAD <br /> NEW HOPE ROAD TYPICAL SECTION Sta. 34+30 to Sta. 41 +80 (Lt.) & (Rt.) <br /> 3 <br /> "_ 30' R/w Sta. 0+70 to Sta. 34+30 <br /> ° Var. 4' <br /> 6% GENERAL NOTES <br /> a m __ Enform– <br /> Con ,� .`r 1 . The Asphalt Concrete (0.21'-0.25' resurfacing) shall be placed in two (2) <br /> o `, layers of approximate equal thickness with pavement reinforcing fabric placed <br /> 'a ✓i on existing or prepared surface. <br /> m _- -g Shoulder Backing 2. All Pavement Repair must be completed 18 hours prior to placement of <br /> Zr --- Imported Borrow Asphalt ConcreteP p p <br /> NEW HOPE ROAD <br /> A❑ 3. Shoulder Backing Material at all intersection radii shall be blended with the <br /> Ea 6+10 t Misc. Areas top 6' of native soil material as directed by the Engineer. Payment for <br /> P Sta. 6+10 to Sta. 6+30 (Lt.)Sta. 7+50 to Sta. 12+50 Lt. blending shall be considered as included in the contract unit price paid <br /> % for Shoulder Backing. <br /> Const. <br /> 4. All earthwork (except for final lift of shoulder backing) shall be completed <br /> Limits of Clearing and Grubbing prior to placing final layer of asphalt concrete. No Shoulder Backing Material <br /> and Mailbox relocation. shall be deposited or drifted on the final lift of asphalt concrete surfacing. <br /> 1' 4' 4' 12'-16'12'-14' 4' 4' 1' 5. The contractor shall conduct the Shoulder Backing operations so as not to <br /> disturb or obstruct any existing drainage. <br /> A 22' Pavement Reinforcing Fabric 6. Removal of A.C. Dike, where shown on the plan shall be done in such a <br /> 8% Var. Var. 8% manner as not to damage the existing A.C. surface below the dike. Payment <br /> Conform Nar. �— —� Var onform for the dike removal shall be considered as included in the contract <br /> unit price for Clearing and Grubbing. <br /> 7. Existing rock frontage on Sacramento Boulevard from Sto. 7+70 Sta. 9+00 (Rt.) <br /> m Existing Roadway Shoulder Backing shall be pushed back, then replace on top of Shoulder Backing. <br /> M Shoulder Backing <br /> 0.25' As halt Concrete <br /> Fn SACRAMENTO BOULEVARD TYPICAL SECTION <br /> (� Sta. 6+63 to Sta. 27+66 <br /> COUNTY OF SAN JOAQU 4NO SCALE TYPICAL SECTION 0 WULWAIW AND NOPE Roan �RFA�c Sheet No. <br /> Town of Thornton 2 of 10 <br /> DRAWN BY DATE PROJECT ENGINEER I DATE CHECKED DATE SLEINIV ED DATE APPROVAL RECOMMENDED DATE <br /> 0 T, <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).