My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2640 - SP2645
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2640 - SP2645
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:11:17 AM
Creation date
1/23/2016 12:46:35 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Davis Road Resurfacing
Limits
Woodbridge Road to Peltier Road
Year
2002
Project Engineer
Ponch Trevino
Roads Worked
Davis Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2640 - SP2645
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rL Const. <br /> Limits of Clearing and Grubbing and Mailbox relocation. <br /> 1 ' 4' 4' 12' ►I 12' 4' 4' 1' <br /> 1' 22' Pavement Reinforcing Fabric �l ' <br /> 8% Var. I Var. _8% <br /> Conform y r Conform <br /> Variable Depth I 0.25' Asphalt Concrete Overlay Variable Depth <br /> Shoulder Backing Existing Roadway TYPICAL SECTION Shoulder Backing <br /> Const. Sta. 10+45 to Sta. 115+65 <br /> Limits of Clearing and Grubbing <br /> sand Mailbox relocation. <br /> D <br /> 1, Earthwork 12' <br /> m (Misc. Areas) <br /> 4' 4' 1 ' Pavement GENERAL NOTES <br /> Reinforcing abric <br /> 1. The Asphalt Concrete (0.25' resurfacing) shall be placed 5. Removal of A.C. Dike, where shown on the plan shall be <br /> a Conform in two (2) layers of approximate equal thickness with done in such a manner as not to damage the existing A.C. <br /> LVOf' pavement reinforcing fabric placed on prepared existing surface. surface below the dike. Payment for removal of dike shall <br /> be considered as included in the Clearing and Grubbing item <br /> 2. Shoulder Backing Material at all intersection radii shall of work. <br /> L _ be blended with the top 6" of native soil material as 6. Removal of Concrete Headwalls where shown on the plans <br /> 0.25' Shoulder Backing directed by the Engineer. Payment for blending shall be shall be done in such a manner as not to damage or <br /> LExistin Roadway considered as included in the contract unit price paid <br /> 9 Y disturb the existing Structure underneath. Payment for the <br /> for Shoulder Backing. <br /> EARTHWORK Misc, Areas Concrete Removal shall be considered as included in the <br /> Sta. 17+00 to Sta. 18+00 (Lt. & Rt.) 3. All earthwork (except for final lift of shoulder backing) Removing Concrete item of work. <br /> p Sta. 21+00 to Sta. 23+00 (Lt.) shall be completed prior to placing final layer of asphalt <br /> o Sta. 41+00 to Stu. 51+00 (Rt.) concrete. No Shoulder Backing Material shall be deposited 7. Cleaning ends of Exist. cross—drain at Sta. 71 +80 shall be <br /> FSta. 50+00 to Sta. 51 +00 (Lt.) or drifted on the final lift of asphalt concrete surfacing. done in such a manner as not to damage existing Structure. <br /> �., Payment for cleaning cross—drain and sloping shoulders to <br /> n Sta. 74+00 to Sta. 87+00 (Rt.) 4. The contractor shall conduct the Shoulder Backing operations <br /> '+ so as not to disturb or obstruct any existing drainage. drain, shall be provided under Item No.t Force Account. <br /> m Sta. 79+00 to Sta. 80+00 (Lt.) <br /> i sta. 85+00 to Sta. 87+00 (Lt.) <br /> Sta. 104+00 to Sta. 112+00 (Rt.) <br /> COUNTY OF SAN JOA UIN NO SCALE TYPICAL SECTION DAVIS ROAD RESURFACING Sheet No. <br /> Q AND GENERAL NOTES (Woodbridge Road to Peltier Road) 2 of 6 <br /> DRAWN BY DATE I PROJECT ENGINEER I DATE CHECKED DATE SUBMITTED �D/A-TE APPROVAL RE OOM�MENDED LDATE <br /> A77 4/°Z I'-_4Twcw� 7/i��n yn/z ,P �� fz//.p a/�o ez <br />
The URL can be used to link to this page
Your browser does not support the video tag.