Laserfiche WebLink
REMOVING CONCRETE EARTHWORK (MISC. AREAS) ASPHALT CONCRETE (TYPE A) <br /> Location Quantity Location Quantity Location Quantity <br /> Ste. 23+20 (Lt. & Rt.) <br /> (Headwalls) Sta. 17+00 to Sia. 18+00 (Lt. & Rt.) 2 Sta. Mainline 4,807 Tons <br /> Lump Sum Stu. 21+00 to Stu. 23+00 (Lt.) 2 Sta. Intersections 34 Tons <br /> Sta. 111 +75 (Rt.) Sta. 41+00 to Stu. 51 +00 (Rt.) 10 Sta. Driveways 113 Tons <br /> (Driveway Approx. 28 S.Y > Stu. 50+00 to Sta. 51 +00 (Lt.) 1 Sta. Total 4,954 Tons <br /> Stu. 74+00 to Sta. 87+00 (Rt.) 13 Sta. <br /> Ste. 79+00 to Sta. 80+00 (Lt.) 1 Sta. <br /> Sta. 85+00 to Sta. 87+00 (Lt.) 2 Sta. <br /> Sta. 104+00 to Sto. 112+00 (Rt.) 8 Sta. <br /> Total 39 Stu. <br /> S <br /> PLANING ASPHALT <br /> CONCRETE PAVEMENT PAVEMENT REINFORCING <br /> Location Quantity FABRIC <br /> oSta. 8+87 to Sta. 9+37 178 S.Y. SHOULDER BACKING Location Quantity <br /> ? Woodbridge Road (East) 72 S.Y. <br /> i Woodbridge Road (West) 72 S.Y. Location Quantity Sta. 9+35 to Sta. 62+30 12,943 S.Y. <br /> Sta. 115+30 to Stu. 115+65 170 S.Y. Sta. 63+30 to Sta. 115+30 12,771 S.Y. <br /> Total 492 S.Y. Sta. 10+13 to Sta. 115+65 2,121 Tons 25,714 S.Y. <br /> PLACE SURVEY MONUMENT <br /> ADJUST MONUMENT DRIVEWAYS FRAMES AND COVERS <br /> FRAME AND COVER <br /> QuantityLocation Quantity <br /> Location QuantityType No. I Area Sta. 62+87 t12' (Lt.) 1 Each <br /> f D 6 158 S.Y. Sta. 89+30 t 2' (Rt.) 1 Each <br /> Stu. 10+00 1 Each E 16 713 S.Y. Total 2 Each <br /> m <br /> O 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES (Woodbridge d9 QAD RRoae to eltierr Road)CING Sheet <br /> of 6 <br /> DRAWN BY DATE IPROJECT ENGINEER I DATE CHECKED DATE SUBMITTED `D,ATE APPROVAL R COMMENDED DATE <br /> Pr ppi. 41,Z /, 4T 11-11,2 4/T�o 4140 C 4� <br />