Laserfiche WebLink
ASPHALT CONCRETE PAVEMENT REINFORCING FABRIC PLACE MONUMENT <br /> (TYPE A) Location Quantity FRAME AND COVER <br /> Location Quantity Sta. 10+08 to Sta. 120+10 29,334 S.Y. Location Quantity <br /> Sta. 26+52 1 Each <br /> Mainline 6,587 Tons Sta. 119+33 1 Each <br /> Total 2 Each <br /> ASPHALT CONCRETE <br /> (TYPE B) MODIFY EXISTING DRAINAGE FACILITIES <br /> 6 Location Quantity Location Quantity <br /> a <br /> Sta. 47+56 (Lt.) Extend Cross Drain <br /> Intersections 77 Tons <br /> y Widening 2,170 Tons Sta. 47+56 (Rt.) R & D Ex. S.D.I. <br /> o Pavement Repair 100 Tons Place S.D.I. L.S. <br /> n <br /> 3 <br /> Driveways (Type D) 50 Tons <br /> Sta. 93+77 (Rt.) Place 18 Inch S.D.I. <br /> Driveways (Type E) 100 Tons Connect To Ex. S.D.I. <br /> o A.C. (Mist. Areas) 11 Tons I Adjust Ex. Frame & Cover <br /> � Total 2,508 Tons <br /> ASPHALT CONCRETE (MISC. AREAS) a�9RYay° <br /> (A Location Quantit �C�OpC1 Q .t t� No. 123341 <br /> N 47+56 Rt. 17 S.Y. Pv_r_ CMI <br /> ' p 93+77 Rt. 11 S.Y. qc \f <br /> 0 <br /> 110+20 Rt. 11 S.Y. N <br /> •1�+ _r 21 02 Total 33 S.Y. ate 9 <br /> f <br /> � <br /> Any Per-,or '-'Is <br /> m <br /> o <br /> COUNTY OF SAN JOAQUIN SUMMARY OF QUANTITIES (State DAVIS <br /> IMPROVEMEe 12 to NTS Sheet <br /> e <br /> NO SCALE <br /> DRAWN BY DATE PROJECT ENGINEER I DATE PHFrKM SUBMITTED DAIS I APPROVAL RECOMMENDED I DATE <br />