My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2678 - SP2685
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2678 - SP2685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:13:19 AM
Creation date
1/23/2016 12:47:26 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Escalon-Bellota Road Resurfacing
Limits
1 Mile South of Flood Road to State Highway Route 26
Year
2002
Project Engineer
Deen Gilman
Roads Worked
Escalon-Bellota Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2678 - SP2685
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
< <br /> 0.25' A.C. Overlay o <br /> I I <br /> I I <br /> f <br /> Sta. 4+00 22"t <br /> Conform � <br /> m <br /> m <br /> R 319 <br /> m' <br /> m <br /> R 318 <br /> Construction <br /> 2 <br /> ° g 317 <br /> _ <br /> E.P. <br /> E � <br /> m <br /> 316 <br /> 315 R 0 A O R <br /> m' 314 B E L L O T A R <br /> Sta. 317+18 ® Escalon—Bellotti Road <br /> m E S C A L 0 N <br /> = Sta. 5+00 ® Flood Road <br /> � N N <br /> I <br /> D_ <br /> W <br /> a <br /> E.P. <br /> Sta. 5+78 <br /> Conform 24't Sta. 317+17f (58't Rt.) <br /> Adjust Monument Frame <br /> and Cover <br /> P <br /> A 10 <br /> � m I� <br /> T I <br /> m <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN No SCALE Ilk <br /> PLAN ESCALON—BELLOTA ROAD RESURFACING sheet No. <br /> (1 Mile South O Flood Road to State Highway Route 26) 4 of s <br /> DRAWN BY DATE PROJECT EN INEER DATE C D DATE SUBMITTED DATE APPROVAL RECOMMENDED <br /> 41�incent�i C OJ �/ /ZP�i <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.