My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2696 - SP2706
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2696 - SP2706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:14:59 AM
Creation date
1/23/2016 12:47:50 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Howard Road Resurfacing
Limits
Roberts Road to Wolfe Road
Year
2002
Project Engineer
Owen Davis
Roads Worked
Howard Rd.
Red Lines
No
Federal #
STPL-5929(132)
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2696 - SP2706
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note Below <br /> 4' Minimum Width Existing <br /> (Unless Otherwise Noted) Surface <br /> Note: <br /> Width, length and locations to be - 0.60' Asphalt Concrete <br /> m determined by the Engineer. <br /> i <br /> A <br /> O <br /> m <br /> PAVEMENT REPAIR DETAIL <br /> t <br /> o > <br /> A 0 <br /> 2 �1 <br /> v m <br /> K GENERAL NOTES -- Conform ® E.P. <br /> 0 1. Contractor shall scarify native soil adjacent to pavement to a depth of 6 inches EP <br /> and blend gravel shoulder material prior to compaction. Limits of this work is <br /> > confined to intersection radii plus 50' each direction. Payment for blending shall ,p <br /> a be considered as included in the contract unit price for Shoulder Backing <br /> 7f E% <br /> aO 2. Excavated material generated by pavement repair and by planing asphalt concrete / <br /> pavement shall be pulverized and incorporated into shoulder backing. At no location R = Conform to \ "*\--Conform <br /> shall excavated material exceed 509 of the shoulder components. Payment for existing radii. I - Conform I a <br /> pulverization, on site haul and incorporation of excavated material shall W No. C23341 <br /> be considered as included in the various items of work and no additional * em. is-yi-°5 * <br /> compensation will be allowed therefore. Variable depth Asphalt Concrete 9Ow- <br /> 3, 2! <br /> �F�N <br /> t - All shoulder work, except for final lift of gravel shoulder backing shall be over existing paved driveway. <br /> kAcompleted prior to placing the final lift of asphalt concrete surfacing. TYPE E <br /> �4 4. Placement of asphalt concrete surfacing shall not begin until the asphalt concrete <br /> v <br /> � used in pavement repair has been in place for one day. <br /> }a A TYPICAL DRIVEWAYS <br /> V T <br /> O m <br /> z <br /> w o <br /> COUNTY OF SAN JOAQUIN NO SCALE CONSTRUCTION DETAILS AND HOWARD ROAD RESURFACING Sheet No. <br /> GENERAL NOTES (Roberts Road to Wolfe Road) 3 of 11 <br /> DRAWN BY I DATE PROJECT ENGINEER I DATE I CHECKED DATE SUBMITTED DATE APPROVAL RECOMMENDED DATE <br /> 0"f,h 4Wid 171110? O 11W&O 790 llf, - '/f a Apwr( ,) ;/� <br />
The URL can be used to link to this page
Your browser does not support the video tag.