Laserfiche WebLink
CLEAN EXISTING DRAINAGE FACILITIES SHOULDER BACKING ASPHALT CONCRETE (TYPE B) <br /> Location Quantity Location Quantity Location Quantity <br /> Cross Drain Sto. 11 +25 to Sta. 94+00 1 ,165 Tons Intersections 793 Tons <br /> Sta. 11 +58 1 Each <br /> Pavement Repair 282 Tons <br /> Driveways 437 Tons <br /> A.C. Dike 14 Tons <br /> PAVEMENT REPAIR <br /> Location Quantity DRIVEWAYS (TYPE D) L Total 1,526 Tons <br /> Throughout Project (33 locations) 571 S.Y. Quantity Area <br /> 7 Locations 260 S.Y. <br /> PLANING ASPHALT <br /> CONCRETE PAVEMENT ASPHALT CONCRETE DIKE <br /> Location Quantity Location Quantity <br /> Mainline 10,191 S.Y. DRIVEWAYS (TYPE E) So. 11 +25 to Sta. 11 +65 (Lt.) 45 L.F. <br /> o Intersections Quantity Area Sta. 18+62 to Sta. 21 +12 (Lt.) 250 L.F. <br /> (7 Locations) 1,483 S.Y. Stu. 19+00 to Sto. 21 +12 (Rt.) 212 L.F. <br /> Edae Planing 46 Locations 2,394 S.Y. <br /> (Refer to Plans) 766 S.Y. <br /> n <br /> Total 507 L.F. <br /> n <br /> 3 Total 12,440 S.Y. <br /> S <br /> 3 <br /> i <br /> ADJUST MONUMENT FRAME & COVER DRIVEWAYS (TYPE F) <br /> Location Quantity Quantit Area PAVEMENT REINFORCING FABRIC <br /> Sta. 43+15 (20' Rt. C.O.S. Mon. Box) 1 Each 7 Locations 626 S.Y. Location Quandt <br /> Sta. 54+30 (16' Rt. C.O.S. Mon. Box) 1 Each y <br /> Total 2 Each Sta. 11 +25 to Sta. 94+00 21,915 S.Y. <br /> U (24' Wide) <br /> 1 N <br /> EARTHWORK (MISC AREAS) ASPHALT CONCRETE (TYPE A) <br /> Location <br /> Quantity Location <br /> Quantity <br /> � Sta. 11 +25 to Sta. 94+00 82.75 Sta. <br /> M <br /> (Includes placing, spreading and compacting Mainline Resurfacing 3PLACE MONUMENT FRAME & COVER <br /> r approximately 622 C.Y. of excavated ,345 Tons <br /> m material from A.C. grinding and pavement Ash Street S. Intersection 107 Tons Location <br /> Quantity <br /> P <br /> repair throughout project limits) Total 3,452 Tons Sta. 27+94 1 Each <br /> COUNTY OF SAN JOAQUIN INO SCALE SUMMARY OF QUANTITIES FRENCH CAMP ROAD RESURFACING Sheet No. <br /> (EI Dorado Street to Airport Way) 11 of 11 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHE DATE S.WMIJED DATE APPROVAL RE OMMENDED DATE <br /> /[NN '�` ,L .� X1,1'♦ 1/J'f�s t1' 1�lrt� �� � lD L <br />