My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2715 - SP2725
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2715 - SP2725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:22:20 AM
Creation date
1/23/2016 12:48:18 AM
Metadata
Fields
Template:
Small Plans - SP
Project
French Camp Road Resurfacing
Limits
El Dorado Street to Airport Way
Year
2002
Project Engineer
Ken Lyder
Roads Worked
French Camp Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2715 - SP2725
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLEAN EXISTING DRAINAGE FACILITIES SHOULDER BACKING ASPHALT CONCRETE (TYPE B) <br /> Location Quantity Location Quantity Location Quantity <br /> Cross Drain Sto. 11 +25 to Sta. 94+00 1 ,165 Tons Intersections 793 Tons <br /> Sta. 11 +58 1 Each <br /> Pavement Repair 282 Tons <br /> Driveways 437 Tons <br /> A.C. Dike 14 Tons <br /> PAVEMENT REPAIR <br /> Location Quantity DRIVEWAYS (TYPE D) L Total 1,526 Tons <br /> Throughout Project (33 locations) 571 S.Y. Quantity Area <br /> 7 Locations 260 S.Y. <br /> PLANING ASPHALT <br /> CONCRETE PAVEMENT ASPHALT CONCRETE DIKE <br /> Location Quantity Location Quantity <br /> Mainline 10,191 S.Y. DRIVEWAYS (TYPE E) So. 11 +25 to Sta. 11 +65 (Lt.) 45 L.F. <br /> o Intersections Quantity Area Sta. 18+62 to Sta. 21 +12 (Lt.) 250 L.F. <br /> (7 Locations) 1,483 S.Y. Stu. 19+00 to Sto. 21 +12 (Rt.) 212 L.F. <br /> Edae Planing 46 Locations 2,394 S.Y. <br /> (Refer to Plans) 766 S.Y. <br /> n <br /> Total 507 L.F. <br /> n <br /> 3 Total 12,440 S.Y. <br /> S <br /> 3 <br /> i <br /> ADJUST MONUMENT FRAME & COVER DRIVEWAYS (TYPE F) <br /> Location Quantity Quantit Area PAVEMENT REINFORCING FABRIC <br /> Sta. 43+15 (20' Rt. C.O.S. Mon. Box) 1 Each 7 Locations 626 S.Y. Location Quandt <br /> Sta. 54+30 (16' Rt. C.O.S. Mon. Box) 1 Each y <br /> Total 2 Each Sta. 11 +25 to Sta. 94+00 21,915 S.Y. <br /> U (24' Wide) <br /> 1 N <br /> EARTHWORK (MISC AREAS) ASPHALT CONCRETE (TYPE A) <br /> Location <br /> Quantity Location <br /> Quantity <br /> � Sta. 11 +25 to Sta. 94+00 82.75 Sta. <br /> M <br /> (Includes placing, spreading and compacting Mainline Resurfacing 3PLACE MONUMENT FRAME & COVER <br /> r approximately 622 C.Y. of excavated ,345 Tons <br /> m material from A.C. grinding and pavement Ash Street S. Intersection 107 Tons Location <br /> Quantity <br /> P <br /> repair throughout project limits) Total 3,452 Tons Sta. 27+94 1 Each <br /> COUNTY OF SAN JOAQUIN INO SCALE SUMMARY OF QUANTITIES FRENCH CAMP ROAD RESURFACING Sheet No. <br /> (EI Dorado Street to Airport Way) 11 of 11 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHE DATE S.WMIJED DATE APPROVAL RE OMMENDED DATE <br /> /[NN '�` ,L .� X1,1'♦ 1/J'f�s t1' 1�lrt� �� � lD L <br />
The URL can be used to link to this page
Your browser does not support the video tag.