My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2715 - SP2725
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2715 - SP2725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:22:20 AM
Creation date
1/23/2016 12:48:18 AM
Metadata
Fields
Template:
Small Plans - SP
Project
French Camp Road Resurfacing
Limits
El Dorado Street to Airport Way
Year
2002
Project Engineer
Ken Lyder
Roads Worked
French Camp Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2715 - SP2725
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> -- Limits of Clearing and Grubbing <br /> Refer to Plan Sheets for Width Variation - <br /> 1 ' f 4' 4' , 4' _. 12' — _� .. 12' _. 4'-6' 4' f ¢' 1' } <br /> Typ. <br /> 24' Pavement Reinforcing Fabric <br /> 0 <br /> o <br /> 3 3 <br /> 0 O <br /> Va . Vag Varma1 8% 3 <br /> - - -_ iar. -- --a Vag _ --_- <br /> Vac - —- <br /> or <br /> I I <br /> ---- - -- -_ -_ -. _---_ --. ------_ -. J <br /> -Existing Roadway 0.10' (min.) Shoulder Backing <br /> 9 y over shoulder embankment <br /> a <br /> 0.17' Asphalt Concrete Overlay i from A.C. Grindings and <br /> ,—� on Planed Surface. Pavement Repair. (Typ.) <br /> e (Refer to Plan Sheets for Planing) <br /> - Earthwork (Misc. Areas) <br /> 3 TYPICAL SECTION (Typ ) <br /> Sta . 1 1 +25 to Sta . 94+00 <br /> 0 <br /> GENERAL NOTES <br /> 1. Contractor shall scarify native sail adjacent to pavement to a 4. Removal of A.C. Dikes where shown on the plan shall be done <br /> depth of 6 inches and blend shoulder backing material prior to in such a manner as not to damage the surface beneath the dike. <br /> compaction. Limits of this work is confined to intersection radii Payment for Dike removal shall be considered as included in <br /> plus 50' each direction. Payment for blending shall be considered the contract lump sum price for clearing and grubbing. <br /> as included in the contract unit price paid for shoulder backing. <br /> 5. Asphalt concrete grindings from planing and pavement repair shall be <br /> 2. All earthwork, except for final lift of shoulder backing shall be placed as shoulder embankment and spread throughout the project limits. <br /> o completed prior to placing the final lift of asphalt concrete Payment for this work shall be by the Earthwork (Misc. Areas) Pay Item. <br /> surfacing. <br /> O • f 6. The Contractor shall enter into an agreement with the Union Pacific <br /> N 3. Placement of asphalt concrete surfacing shall not begin until the Railroad Company for work within the railroad's jurisdiction. <br /> asphalt concrete used in pavement repair has been in place for <br /> m 24 hours. <br /> 0 <br /> COUNTY OF SAN JOA UIN NO SCALE TYPICAL SECTION & FRENCH CAMP ROAD RESURFACING Sheet No. <br /> Q GENERAL NOTES (EI Dorado Street to Airport Way) z of 11 <br /> DRAWN BY DATE PROJECT ENGINEER I DATE QJL9KED DATE SUBMITTED DATE APPROVAL REGOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.