Laserfiche WebLink
CLEANING EXISTING ADJUST MAINTENANCE HOLE ASPHALT CONCRETE (TYPE B) <br /> DRAINAGE FACILITIES Lum_pum FRAME AND COVER LEVELING <br /> Location Quantity Location Quontity Location Quantity <br /> Mainline: "a ' <br /> 2' Rt. 1 Each Ste. 10+65 TO Ste. 18+00 (Lt. & Rt.) 126 Tons <br /> Station. 10+55 (Rt. & Lt.) i Sta. 16+033 2' Rt. 1 Each <br /> Station. 30+31 (Rt. & Lt.) 1 Yr Ste. 19+603 2' Rt. i Each <br /> Intersections: Ste. 23+283 2' Rt. 1 Each <br /> Williams St. Station. 05+37 (Rt. & Lt.) 1 C Ste. 27+443 3' Rt. 1 Each PAVEMENT REINFORCING FABRIC <br /> E St. Station. 05+37 (Rt. & Lt. 1 Total <br /> E St. Station. 04+75 Rt. & Lt. 1 * Not Shown in Plans 5 Each <br /> F St. Station. 05+16 Rt. & Lt.) 1 Location Quantity <br /> Total 6 Ste. 10+65 to Ste. 29+82 3,840 S.Y. <br /> SHOULDER BACKING <br /> m Location Quantity <br /> i -- <br /> PAVEMENT REPAIR Ste. 10+15 to Ste. 30+32 e0 Tans <br /> Location _ Quantity <br /> N <br /> 20 Locations 249 S.Y. DRIVEWAYS <br /> i F <br /> z Qtwn <br /> TYPa <br /> a <br /> No. 'M6 ; <br /> m <br /> D 34 304 S.Y. <br /> c <br /> �3 E 19 328 S.Y. <br /> PLANING ASPHALT <br /> CONCRETE PAVEMENT <br /> Location Quantity ASPHALT CONCRETE (TYPE B) <br /> Mainline: Location Quantity` <br /> N Stan 10+15 to Ste. 10+40 132 S.Y. <br /> Sta. 30+17 to Ste. 30+32 44 S.Y. Mainline 577 Tons <br /> /O Intersections: Intersection 85 Tons <br /> v Intersection O Williams Street 56 S.Y. Driveways 93 Tons <br /> Intersection O E Street 111 S.Y. Y <br /> U $ Intersection O F Street 111 S.Y. Pavement Repair 83 Tons <br /> J Total 454 S.Y. Total 838 Tara <br /> W rn <br /> a <br /> WILLOW MEET 'RMURFACING Sheet No. <br /> Q (D Street to Filbert Street) 6 of 6 <br /> COUNTY OF SAN JOA UIN NO SCALESUMMAf2Y OF QUANTITIES <br /> DRAWN BY DATE I PROJECT'ENGINEER DATE CHECKED DATE SUBMnTED DATE APPROVAL RECOMMENDED DATE <br /> f�irni9we.�[lwu 40%2 ,k�t 1�14.t' •o/1Z ez •e�/^L rcv' �L{,d/ /4n�cAlE jA Joj Z <br />