My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2783 - SP2792
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2783 - SP2792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:29:44 AM
Creation date
1/23/2016 12:49:43 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Elliott Road Resurfacing
Limits
Peltier Road to Liberty Road
Year
2002
Project Engineer
Ponch Trevino
Roads Worked
Elliott Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2783 - SP2792
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Show annotations
View images
View plain text
Ct Const. <br /> ® Limits of Clearing and Grubbing. and Mailbox relocation. <br /> 11.5 — ! — 11 .5' 0-4' 2 1' <br /> 1' 2© 0-4' <br /> Or 8% „�Var. Val _89. t' <br /> Conform o ' -- a moo` Conform <br /> Variable Depth I 0.25' Asphalt Concrete Variable Depth <br /> Shoulder Backing Existing Roadway TYPICAL SECTION Shoulder Backing <br /> 6 <br /> a, Sta. 10+55 to Sta. 170+50 <br /> 20' R/W <br /> s <br /> a <br /> —. a. Var. 4' <br /> E 8% <br /> _ GENERAL NOTES <br /> > a <br /> s V 1' L-- <br /> M \ U -11 I � Shoulder Backing 1. The Asphalt Concrete (0.25' resurfacing) shall be placed { :` <br /> - - - - Imported Borrow in two (2) layers of approximate equal thickness. <br /> Earthwork Misc. Areas (Type I)8 2. Shoulder Backing Material at all intersection radii shall <br /> be blended with the top 6" of native soil material as <br /> Sta. 24+30 to Sta. 27+00 Lt. directed by the Engineer. Payment for blending shall be + <br /> Sta. 27+40 to Sta. 30+40 Lt. considered as included in the contract unit price paid <br /> Sta. 31 +25 to Sta. 31 +55Lt. . for Shoulder Backing Item of work. t .? <br /> U <br /> ® <br /> 3. All earthwork (except for final lift of shoulder backing) {Limits d Clearing and Grubbing shall be completed prior to placing final layer of asphalt <br /> extended to 20� left of centerline <br /> �- of construction from Sta. 22+00 concrete. No Shoulder Backing Material shall be deposited . <br /> or drifted on the final lift of asphalt concrete surfacing. <br /> o- to Sta. 32+00. <br /> �, 4. The contractor shall conduct the Shoulder Backing operations <br /> M © when adjacent to earthwork so as not to disturb or obstruct any existing drainage. <br /> Miscellaneous Areas (Type Q. ` <br /> J m 2" Shoulder Backing taper equals zero. ? <br /> �V z <br /> COUNTY OF SAN JOA UINNO SCALE TYPICAL SECTION ELLIOTT ROAD RESURFACING Sheet No. <br /> AND GENERAL NOTES (Peltier Road to Liberty Road) 2 of 10 <br /> DRAWN BY DATE PROJECT ENGINEER I DATE CH CKED DATE SUB ITTED DATE I APPROVAL RECOMMENDED DATE <br /> P,T i%2 Pmt rA--o* o/,e� ��z�a os rJ �olJ' Z. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).