My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2805 - SP2811
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2805 - SP2811
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 10:06:44 AM
Creation date
1/23/2016 12:50:13 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Armstrong and Mundy Roads Resurfacing
Limits
Armstrong Road: N 99 Frontage Road (E) to Curry Avenue Mundy Road: Armstrong Road to Hogan Lane
Year
2003
Roads Worked
Armstrong Rd., Mundy Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2805 - SP2811
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Show annotations
View images
View plain text
PAVEMENT REPAIR DRIVEWAYS PAVEMENT REINFORCING FABRIC <br /> Location Quantity Type Qua tity Location Quantity <br /> 7 Locations throughout 192 S.Y. No. Area <br /> Armstrong Road <br /> D 29 376 S.Y. Stu. 1+83 to Sta. 3+25 (24' wide) 352 S.Y. <br /> E 49 712 S.Y. Sto. 3+25 to Sta. 46+83 (18' wide) 8,706 S.Y. <br /> Sta. 47+08 to Sto. 47+65 (18' wide) 124 S.Y. <br /> Sto. 47+85 to Sta. 61+85 (18' wide) 2,800 S.Y. <br /> Furry Road <br /> PLANING ASPHALT Sto 4+15 to Sto.5+85 (20' wide) 378 S.Y. <br /> CONCRETE PAVEMENT Mundy Road <br /> Location Quantity ASPHALT CONCRETE (TYPE B) Sta. 0+10 to sta. 26+24 (22' wide) 6,390 S.Y. <br /> m <br /> Armstrong Road Location Quantity Total 18,750 S.Y. <br /> Sta. 1+68 to Sta. 1+93 236 S.Y. <br /> y <br /> C.(iRailroad 56 S.Y. Mainline <br /> 3 Includes between the rails) Armstrong Rd. 2,402 Tons <br /> !g Sta. 61+85 to Sta. 62+00 33 S.Y. Mundy Rd. 818 Tons <br /> R Furry Road Intersection 66 S.Y. Furry Int. 64 Tons PLACE SURVEY MONUMENT <br /> s Mundy Road Qdyrwovs (Types D& El 154 Tons FRAME AND COVER <br /> Sto. 26+24 to Sta. 26+34 62 S.Y. Povement Repair 67 Tons <br /> n Total 453 S.Y. LocationTotal 3,505 Tons Quantity <br /> n <br /> o Armstrong Road <br /> T Sta. 25+85t - 1 Each <br /> '= Mundy Road <br /> SHOULDER BACKING Sta. 17+59t 1 Each <br /> LocationQuanti ty ASPHALT CONCRETE (TYPE B) Total z Each <br /> Armstrong Road LEVELING <br /> Sta. 1+68 to Stu. 462+00 <br /> Mundy Road Location Quantity <br /> N Sta. 0+10 to Sta. 26+34 1 574 Tons <br /> ' Armstrong Road: <br /> b Fuad <br /> o� Sto 4+00 to Stu 6+00 Sta. 47+16 to Stu. 47+65 103 Tons <br /> F <br /> n <br /> O m <br /> Z <br /> LO <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITY ARMSTRONG AND MUNDY ROADS Sheet No. <br /> CONSTRUCTION DETAIL RESURFACING 7 of 7 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHE DATE �rlAPP�RO�VAL RECOMMENDED D-ATLE - - <br /> Yomron�. P�Rf 4(ey ep 4�3 i�Ga4.Y 4�''!�3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).