My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2823 - SP2831
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2823 - SP2831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 10:07:36 AM
Creation date
1/23/2016 12:50:39 AM
Metadata
Fields
Template:
Small Plans - SP
Project
River Road/Henry Road Resurfacing
Limits
Santa Fe Road to Henry Road; Santa Fe Road to River Road
Year
2003
Project Engineer
Ponch Trevino
Roads Worked
River Rd., Henry Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2823 - SP2831
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> Limits of Clearing and Grubb ing, and Mailbox Relocation <br /> See I See <br /> Shoulder 12' 12' Shoulder <br /> Details Details <br /> on on <br /> Sheet 1 ' 22' Pavement Reinforcing Fabric 1' Sheet <br /> No. 3. <br /> �Var. <br /> Val <br /> ---------- ---- <br /> -- — <br /> v <br /> o 0.17'-0.25' Asphalt Concrete <br /> m Existing Roadway Overlay <br /> i <br /> TYPICAL SECTION <br /> RIVER ROAD AND HENRY ROAD <br /> z <br /> s <br /> p GENERAL NOTES <br /> m <br /> 1. Asphalt Concrete (0.17' resurfacing) shall be placed in one (1) layer with pavement reinforcing fabric placed on the existing <br /> z surface. Asphalt Concrete (0.25' resurfacing) shall be placed in two (2) layers of approximate equal thickness with pavement <br /> reinforcing fabric placed between the two layers. <br /> 2. All existing trees, shrubs, fences and other frontage improvements are to remain in place unless otherwise noted. <br /> 3. Contractor shall scarify native soil adjacent to pavement to intersection radii to a depth of 6", Sta. 8+40 to Sta. 8+60 (Right) on <br /> River Road and blend shoulder backing material prior to compacting. Payment for blending shall be considered as included in the <br /> price for Shoulder Backing. <br /> 4. All Earthwork (except for final shoulder grading) shall be completed prior to placing final lift of asphalt concrete. No Shoulder <br /> Backing material shall be deposited or drifted on the final lift of asphalt concrete surfacing. <br /> 1 � 5. Placement of asphalt concrete surfacing shall not begin until the asphalt concrete used in pavement repair has been in place for 24 <br /> hours. <br /> f <br /> i <br /> O <br /> COUNTY OF SAN JOA(�UIN NO SCALE TYPICAL SECTION RIVER ROAD / HENRY ROAD RESURFACING Sheet No. <br /> O Q GENERAL NOTES (Santa Fe Road to Henry Road; Santa Fe Road to River Road) 2 of 9 <br /> DRAWN BY DATE PROJECT ENGINEER DATE PHECKED DATE APPROVAL RECOMMENDED I DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.