My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2838 - SP2850
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2838 - SP2850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 10:09:15 AM
Creation date
1/23/2016 12:50:59 AM
Metadata
Fields
Template:
Small Plans - SP
Project
El Dorado Street Resurfacing
Limits
I-5 to Stockton City Limits
Year
2003
Project Engineer
Kaila Coppal
Roads Worked
El Dorado St.
Red Lines
Yes
Federal #
STPL-5929(144)
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2838 - SP2850
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REMOVING CONCRETE PAVEMENT REPAIR DRIVEWAYS <br /> Location Quantity Location Quantity Type Quantity <br /> Mathews Road IntersectionNo. I Area <br /> Median (South) <br /> 38 Locations 530 S.Y. <br /> 1 D 7 178 S.Y. <br /> Medain (North) 1 E 37 959 S.Y. <br /> Median south , PLANING ASPHALT <br /> Island (NW) <br /> Median (North) <br /> 1 CONCRETE PAVEMENT ASPHALT CONCRETE (TYPE A) <br /> Island (SW) , Location Quantity <br /> Lump Sum Location Quantity <br /> EI Dorado Street <br /> Sta. 0+20 to Sta. 0+50 273 S.Y. Mainline 5,762 Tons <br /> Sta. 41+15 to Sta. 41+40 300 S.Y. Mathews Road Intersection (W. k E.) 56 Tons <br /> Sta. 45+05 to Sta. 45+30 269 S.Y. <br /> CLEAN EXISTING DRAINAGE FACILITIES Stu. 58+25 to Stu. 58+75 356 S.Y. Total 5.818 Tons <br /> m Sta. 60+09 to Sta. 60+59 356 S.Y. <br /> ;> Location <br /> 65+88 to Sta. 66+38 356 S.Y. _ <br /> 3 Location Quantity Lynn Road <br /> S.0.1.'s k Culverts Sta. 5+35 to Sta. 5+60 169 S.Y. ASPHALT CONCRETE (TYPE B) <br /> n Ste. 12+103 ( 52' Lt.) ( 48- SAL) 1 Hurd Road <br /> o Sta. 12+543 ( 50' Lt.) ( 16' Culvert) 1 Sto. 5+33 to Sta. 5+63 52 S.Y. Location Quantity <br /> Sta. 12+723 ( 51' Rt.) ( 18' Culvert) 1 Mathews Road <br /> d$ g Sto. 12+773 ( 58' Lt.) ( 12' Culvert) 1 Sta. 4+21 to Sto. 4+51 91 S.Y. A.C. Dikes 66 Tons <br /> Sta. 12+863 ( 58' Lt.) ( 2'x3' SAL) 1 Sto. 6+03 to Sta. 6+28 89 S.Y. Driveways 116 Tons <br /> e F Stu. 13+28t ( 29' Rt.) ( 2'x3' S.D.I.) 1 Sta. 13+28t (29' Rt. O S.D.I.) 23 S.Y. pavement Repair 177 Tons <br /> J Sta. 13+283 ( 46' Rt.) ( 48* S.D.I.) 1 Hognital Road Intersections 77 Tons <br /> o m Sta. 13+383 ( 56' Lt.) ( 2'x3' S.D.I.) 1 Sto. 3+70 to Sta. 3+95 172 S.Y. <br /> Sta. 15+313 ( 32' Rt.) ( 2'x3' S.D.I.) 1 Sto. 5+92 to Sto. 6+02 27 S.Y. Total 436 Tons <br /> u, Sta. 15+31± ( 38' Rt.) ( 48' S.D.I.) 1 <br /> 3 Sta. 27+723 ( 47' Rt.) ( 2'x3' S.D.I.) 1 Total 2.533 S.Y. . . , <br /> 3 <br /> Total Lump Sum <br /> SHOULDER BACKING `, ro 4 <br /> LA^ Location Quantity rC.i 6IL cfiy <br /> N ADJUST FRAME AND COVER Sta. 0+20 to Sta. 66+38 528 Ton. G Na 35465 <br /> MAINTENANCE HOLE <br /> 1 Location Quantity YItF��e <br /> Sto. 16+143 ( 32' Rt.) 1 Each EARTHWORK (MISC. AREAS) <br /> 0/� <br /> W a Total 1 Each Location Quantity <br /> La Sta. 8+753 to Sta. 12+753 (Ri.) 4 Sta. Peter D. Martin <br /> A o RCE 38465 <br /> mil COUNTY OF SAN JOAQiJIN No SCALE OF QUANTITIES EL DORADO STREET RESURFACING Sheet No. <br /> (1-5 to Stockton City Limits) 12 of 13 <br /> _.. DRAWN BY DATE PROJECT 04 MMR I DATE 1. CHECKED DA_TE/ ,APPROVAL RECOMMENDED. . . .DATE -. <br /> �.rw/dt <br />
The URL can be used to link to this page
Your browser does not support the video tag.