Laserfiche WebLink
PAVEMENT REPAIR PLANING ASPHALT CONCRETE 12' DIIII CORRUGATED STEEL PIPE PAVEMENT REINFORCING FABRIC <br /> Location Quantity PAVEMENT (0.079' Thick) <br /> Location Quantity Location Quantity <br /> 8 Sites throughout project 97 S.Y. Location Quantity <br /> Elvin Avenue Weber 2,696 S.Y. <br /> CLEAN EXISTING Mainline: Sta. 16+282 (12'2 Lt& Rt.) 0 Lf. <br /> Weber <br /> Avenue Anthony Avenue Elvin Avenue 2,696 S.Y. <br /> DRAINAGE FACILITIES Ste. 10+12 to Ste. 10+37 94 S.Y. Sta. 22+602 (12'2 Lt.) 5 Lf. Dane Avenue 2,696 S.Y. <br /> Stu. 21+35 to Ste. 21+55 54 S.Y. <br /> 3 SDI LOCATIONS Elvin Avenue Thelma Avenue 1,151 S.Y. <br /> St.. 10+12 to Ste. 10+32 81 S.Y. DRIVEWAYS <br /> Weber Avenue Sta. t 15+37 Rt. T a T E Adrienne Avenue 1,156 S.Y. <br /> Sta. 21+35 to Ste. 21+55 54 S.Y. yPe Type Elvin Avenue Sta. 2 13+50 (Rt.) Lump Sum NO. Area <br /> Anthony Avenue 2,462 S.Y. <br /> Elvin Avenue Ste. 2 14+10 (Lt.) Deno Avenue Street No. Area <br /> Ste. 10+12 to Ste. 10+32 81 S.Y. Weber Avenue 9 71 S.Y. 26 314 S.Y. Total 12,857 S.Y. <br /> a Ste. 21+35 to Ste. 21+55 54 S.Y. Elvin Avenue 5 58 S.Y. 27 326 S.Y. <br /> ° Thelma Avenue Dana Avenue 5 52 S.Y. 22 502 S.Y. <br /> ADJUST MAINTENANCE HOLE Ste. 10+59 to Ste. 10+79 81 S.Y. Thelma Avenue 5 31 S.Y. 7 166 S.Y. <br /> FRAME & COVER Adrienne Avenue <br /> Adrienne Avenue 8 67 S.Y. 4 112 S.Y. <br /> Location Ste. 10+15 to Stu. 10+35 81 S.Y. Anthony Avenue 11 88 S.Y. 7 64 S.Y. <br /> Quantity Anthony Avenue <br /> r <br /> m 4S 387 S.Y. 92 1,484 S.Y. <br /> o � Weber Avenue Sta. 12+07 to Sta. 12+27 81 S.Y. Total <br /> a Ste. 12+08 (CL) 1 EACH <br /> fe Sta. 16+09 (CL) 1 EACH Total 661 S.Y. ASPHALT CONCRETE E B <br /> Ste. 20+40 (CL) 1 EACH <br /> °n <br /> 3 EACH Loeotlan Quantity <br /> Elvin Avenue Weber Avenue <br /> a Ste. 12+22 (6'2 Rt) 1 EACH Ste. 10+12 to Ste. 21+55 416 TONS <br /> /o Ste. 16+10 (6'2 Rt) 1 EACH Elvin Avenue <br /> o Ste. 19+50 (5'2 Rt) 1 EACH Ste. 10+12 to Sta. 21+55 418 TONS <br /> Dana Avenue -3-EACH Dana Avenue <br /> 3 Sta. 13+08 (CL) 1 EACH Ste. 10+12 to Stu. 21+55 418 TONS <br /> 3 Ste. 13+10 (8'2 Rt) 1 EACH <br /> SHOULDER BACKING Thelma Avenue <br /> Ste. 16+08 (CL) 1 EACH Location Quantity Ste. 10+59 to Ste. 15+52 182 TONS <br /> Ste. 16+14 (8'2 Rt) 1 EACH Adrienne Avenue <br /> Ste. 18+95 (10'2 Rt) 1 EACH Weber Avenue 42 TONS Ste. 10+15 to Stu. 15+10 182 TONS <br /> 5 EACH Anthony Avenue <br /> Thelma Avenue Elvin Avenue 33 TONS Stu. 12+07 to Ste. 22+68 355 TONS <br /> Ste. 11+49 (CL) 1 EACH Dana Avenue 55 TONS <br /> Adrienne Avenue Mainline Total: 1,971 TONS <br /> a <br /> Stu. 11+00 (6'2 Rt) 1 EACH Thelma Avenue 22 TONS <br /> p Anthony Avenue Adrienee Avenue 22 TONS Pavement Reoa7- 32 TONS <br /> L) y Ste. 13+44 (6'2 Rt) 1 EACH Anthony Avenue 34 TONS Driveway,; <br /> f 236 TONS <br /> bam <br /> n Total 14 EACH Total 208 TONS Project Total: 2,239 TONS <br /> N m <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES EAST STOCKTON STREETS RESURFACING PHASE 4 Sheet No. <br /> Weber, Elvin, Dana, Thelma, Andrienne & Anthony Avenues 9 of 9 <br /> DRAWN BY DATE PROJECT ENGINEER I DATE DATE APPROVAL RECOMMENDED DATE <br /> f:.a gwai.Y'ewry Ao/3oay c <br />