Laserfiche WebLink
12" Place Standard frame and <br /> A.C. Overlay <br /> or Sq. cover assembly to finish grade <br /> 6" <br /> Existing See Note Below <br /> Surface 4•• EP Conform at E.P. <br /> 8,. <br /> Exist. Roadway <br /> P.C.C. 3• ° 6" R R <br /> 1 0.40' Asphalt Concrete * 16+05 (Rt.)— 9' Conform <br /> Undisturbed Exist. survey monument <br /> basement soil to remain in place and * 16+76 (Rt.)— 9' Existlny_Width <br /> undisturbed. 17+42 (Rt.)= 9' 12 Minimum <br /> 'h 17+42 (Rt.)= 9' <br /> PAVEMENT REPAIR DETAIL SURVEY MONUMENT DETAIL * 18+05 (RQ= 7' TYPE E <br /> Note: Width (4' minimum), length and locations *21+05 (Lt.)= 7' <br /> to be determined by the Engineer. * 22+82 (Lt.)= 11 ' R = Conform to <br /> 'k 42+03 (I-Q= 10' Existing Radii. <br /> 47+03 (Lt.)= 10' <br /> i <br /> Place salvaged S.D.I. Frame and Grate <br /> by using Portland Cement Concrete. <br /> i Payment for Adjusting Frame and Grate, Conform at E.P. <br /> 12 <br /> o and placing Portland Cement Concrete, _ _EP_ <br /> > will be paid for by the (Adjust Frames and Grates) --- r <br /> f n Item of work. 6 I T <br /> ' I Remove and Salvagee�� <br /> existing S.D.I. Frame \ Conform to c New <br /> aand Grate. \ll A.C. surface �F1�2" <br /> X ----------- _ Conform <br /> o" 3 - --- <br /> 3 Remove existing JJJj� ',°��7J7 Collar "'. ' �Var I Existing Width <br /> -� --- Jr _ 1 _ _ _ _ <br /> -i 12' Minimum <br /> o concrete Collar to 3" TYPE D <br /> -�, a---`----T <br /> below bottom of Frame. " "° tl° " " AB °X " .30' Asphalt Concrete over shaped <br /> Y Exist. u u 12" Ripe Y Exist. i n 'ii �12" Pipet P P <br /> d� nr wa ed and compacted native material. <br /> IExisting S.D.I. Adjust S.D.I. to Grade I TYPICAL DRIVEWAY DETAIL <br /> C'4 ADJUST FRAME AND GRATE DETAIL Variable depth Asphalt Concrete <br /> m over existing paved driveway. <br /> t (Station 48+18-18' Left f Centerline) <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUINNO SCALE CONSTRUCTION DETAILS WILMARTH ROAD RESURFACING Sheet No. <br /> (State Highway Route 88 to Cherokee Road) 5 of 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br />